Similar Projects
Rover Elementary Grading and Drainage Project
Bidding
Tempe, AZ 85283

Dick Mccomb Park Pump Replacement and Pond Improvement
Infrastructure
Bidding
Surprise, AZ 85374

Pipelining and Drainage Services
Post-Bid
Phoenix, AZ 85007

Grand Canyon Airport Construction For Runway Shoulders And Drainage
Infrastructure
Post-Bid
Phoenix, AZ

San Tan West Area Drainage Master Plan-On Call
Results
$800,000 est. value
AZ

South Recharge Phase II
Results
Less than $8,300,000 est. value
Gilbert, AZ 85233

Sun City Drains Improvement - Grand Avenue, Del Webb to Agua Fria
Infrastructure
Bidding
Phoenix, Sun City, AZ 85042

Pipelining and Drainage Services
Infrastructure
Post-Bid
AZ

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Pipelining and Drainage Services
Infrastructure
Post-Bid
AZ

Professional Services - Alma School Road Improvements (Pecos To Germann) And Gilbert Road Improvements
Results
Chandler, AZ

South Canal Shared Use Path
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Mesa, AZ

Williams Field Road Box Culvert Improvements, Williams Field Road and Crismon Road
Results
$700,000 to $800,000 est. value
Mesa, AZ 85211

Pipelining and Drainage Services
Results

Panorama Drive Storm Drain Pipe Replacement
Results
Fountain Hills, AZ 85268

Last Updated 10/18/2021 12:45 PM
Project Title

127Eax21r0039 Granite Reef Invasive Reed Removal

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85215   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction: Heavy equipment required to remove and dispose of invasive giant reed from the shoreline at Granite Reef recreation site. Once cleared 6500 cubic feet of 2-6” rocks will be placed along 650’ of shoreline to stabilize the bank. This project can be done in phases so bids should separate reed removal and shoreline stabilization. Depending on costs and available budget the Forest Service may choose to do only the reed removal part of the project

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents