Similar Projects
Alexander Street Mixed-Use Development
New Construction, Infrastructure
Conception
$502,000 CJ est. value
Yonkers, NY 10701

Stormwater Management Facility
Infrastructure
Conception
$500,000 CJ est. value
White Plains, NY 10601

The Complex at Port Chester
New Construction, Infrastructure - 15,000 SF
Design
$64,000,000 CJ est. value
Port Chester, NY 10573

Renatta Mixed Use Building
New Construction, Infrastructure - 12,600 SF
Design
$100,000,000 CJ est. value
Port Chester, NY 10573

New Community Living Center
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Montrose, NY 10548

Long Pond Gazebo Project
Infrastructure
Post-Bid
$115,000 CJ est. value
Armonk, NY 10504

Excavation in Conjunction with the Replacement of Generator
Infrastructure
Post-Bid
Somers, NY

World-Wide Water Storage Tank Remediation
Term Contract
Results

Walter Panas High School Athletic Fields Improvement Project
Infrastructure, Alteration
Results
Shrub Oak, NY 10567

Maria Regina High School Ball Field
Renovation
Construction
Hartsdale, NY 10530

Ray Place Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Scarsdale, NY 10583

ARC Westchester Renovation
Addition, Infrastructure, Renovation
Pending Verification
$1,500,000 CJ est. value
Mount Kisco, NY 10549

Valhalla New SOD Vehicle Storage Facility
New Construction, Infrastructure
Conception
$7,430,000 CJ est. value
Valhalla, NY 10595

Silvermine Preserve
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
South Salem, NY 10590

Storage L.P Tanks and Line in Conjunction with the Replacement of Generator
Infrastructure
Post-Bid
Somers, NY

Last Updated 10/05/2022 02:18 PM
Project Title

Mamaroneck WRRF BNR Media and Aeration

Physical Address View project details and contacts
City, State (County) White Plains, NY 10601   (Westchester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the replacement of the Biological Nitrogen Removal (BNR) and Integrated Fixed-Film Activated Sludge (IFAS) media, process blowers, and mixers in the aeration tanks and related work. As of September 15, 2021, the budget plan for the next fiscal year which has been formally approved by a majority vote of the County Board of Legislators. Information regarding design firm and general contractor selection timeline not been disclosed. A construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents