Similar Projects
HVAC Replacement Largo Police Department
Bidding
Largo, FL 33771

S--Service: HVAC Air Duct Cleaning
Post-Bid
Bay Pines, FL 33744

Chiller Replacement, Sundial Mid-Core Parking Deck
Post-Bid
Saint Petersburg, FL 33701

FDOT HVAC Install: Sneads WB Weigh Station
Results

City Hall Rooftop Air Conditioner Units Replacement
Results
$48,104 est. value
Oldsmar, FL 34677

Ralph Richards Tower Package Units Replacement
Post-Bid
Clearwater, FL 33756

N--Replacement of 12 Air Handling Units at St. Petersburg VARO
Results
$2,000,000 to $5,000,000 est. value
Saint Petersburg, FL 33708

F Building VAV Replacements, HVAC Unit Cleanings and Related Duct Work
Term Contract
Post-Bid
Less than $195,000 est. value
Saint Petersburg, FL 33701

HVAC Maintenance and Service, Preventative, Police Facilities
Results
Saint Petersburg, FL 33705

Chillers, Direct Purchase
Term Contract
Post-Bid
FL

Controlled Humidity Protection System Services
Results
Avon Park, Bradenton, Fort Myers, Palmetto, Saint Petersburg, West Palm Beach, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Cooling Towers, Preventative Maintenance and Repairs, Police Facilities
Results
Saint Petersburg, FL 33731

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

HVAC Repair Services for Fire Station 71
Results
Tarpon Springs, FL 34688

Last Updated 09/24/2020 12:29 PM
Project Title

Chiller Replacement (PID #004086A)

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33762   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $710,168
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the replacement of an existing 350-ton Air-Cooled Helical Rotary Water Chiller. The chiller is located airside of the terminal building and cools a vast majority of the building which employees, tenants and citizens occupy on a 24-hour basis. Demolition of the existing chiller, its removal from the site and the complete installation of the new chiller is a requirement of the scope of work. Related work generally involves demolition, modifications, removal, delivery, installation, site work, concrete work, metal fabrications, HVAC, paint, controls, pumps, mechanical, plumbing, electrical & lighting systems as per the attached specifications and drawings for this project and as required for a complete and operational system. An alternate bid requests additive pricing for a five (5) year extended warranty (beyond base contract warranty specified) for the chiller including associated pumps and electrical gear.The Warranty shall include all parts and labor. A temporary chiller shall be provided if the warranty repairs cannot be completed within a 72-hour time frame, from the date/time of notification by the Airport of the warranty repair or failure of the chiller. This warranty shall be transferrable to the Airport.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents