Similar Projects
Argentine Street Commercial Building
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Georgetown, CO 80444

Pavement Marking Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Georgetown, CO 80444

Roadway Crack Sealing Project
Infrastructure
Bidding
$90,000 CJ est. value
Georgetown, CO 80444

Eisenhower/Johnson Memorial Tunnel (EJMT) Consolidation Grouting and Structural Repair Project
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Georgetown, CO 80444

Eisenhower/Johnson Memorial Tunnel (EJMT) Consolidation Grouting and Structural Repair Project
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Georgetown, CO 80444

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

On Call Region 1 Asphal Paving Services
Results

Mighty Argo - Argo Landing
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Idaho Springs, CO 80452

John Tomay Library Reconstruction
Addition, Demolition, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, CO 80444

Public Works Facility
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Idaho Springs, CO 80452

Road Construction Services for 2021 Soda Creek Road Pavement Overlay Project
Infrastructure
Results
CO

CCSD-2022 Sanitary Sewer Manhole Rehabilitation Project
Infrastructure
Post-Bid
$340,000 CJ est. value
Idaho Springs, CO 80452

Roadway Crack Sealing Project
Infrastructure
Results
Less than $45,000 est. value
Dumont, CO

Mizpah Campground Aquatic Organism Passage
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Empire, CO 80452

Frost Heave Repair - Witter Gulch Road
Infrastructure
Results
Dumont, CO

Last Updated 01/31/2023 05:13 PM
Project Title

Circle K Stores / Georgetown

Physical Address View project details and contacts
City, State (County) Georgetown, CO 80444   (Clear Creek County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install an Electric Vehicle Charging Station As of January 31, 2023, planning is in progress. No information regarding a general contractor or the method of selection thereof has been established at this time. No construction timeline has been established at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents