Similar Projects
Marine Science Center ADA Enhancements
Bidding
Less than $65,000 est. value
Ponce Inlet, FL 32127

Fleming Avenue ADA Sidewalk
Bidding
Less than $70,500 est. value
De Land, FL 32720

New Smyrna Beach High School Campus Wide Elevated Walkway Repairs
Post-Bid
New Smyrna Beach, FL 32168

Thornby Park Boardwalk and Trail Improvements
Post-Bid
Less than $286,000 est. value
Deltona, FL

Concrete Driveway and Site Work for Lift Station #31 Project
Results
De Land, FL 32720

Providence Boulevard Shared Use Trail
Results
Deltona, FL

New Hampshire Avenue ADA Sidewalk
Post-Bid
Less than $127,000 est. value
De Land, FL 32720

Sunrise Park Boat Ramp Improvements
Results
Less than $1,094,325 est. value
Holly Hill, FL

Dr. Martin Luther King, Jr. Blvd. Roadway and Pedestrian Improvements Project
Results
$2,000,000 to $2,200,000 est. value
Daytona Beach, FL 32100

Design/Build Services for The East Central Regional Rail Trail, Phase 4A (Guise Road to Gobbler's Lodge Road, Osteen)
Results
Osteen, FL

30th Street ADA Sidewalk Project - Pine Tree Drive to Hibiscus Drive
Results
Less than $74,545 est. value
Edgewater, FL

Sweetheart Trail - Sickler Drive
Results
Daytona Beach, FL

Rob Sullivan CDBG / ADA Parking Stalls
Results
DeBary, FL 32713

CDBG Ames Parking Improvements and Landscape Renovations
Results
Ormond Beach, FL 32173

Sidewalk Repair and Reconstruction Project
Results
DeBary, FL

Last Updated 03/12/2019 06:26 AM
Project Title

Sweetheart Trail - Beach St. Wilder Blvd. to Shady Place

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32100   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work generally consists of constructing 2,324 feet (0.440 miles) of concrete shared use path within the City of Daytona Beach. The proposed shared use path extends from the intersection of Wilder Boulevard and Palmetto Avenue, easterly along Wilder Boulevard for 300ft, and then northerly 2024ft along South Beach Street to the intersection of South Beach Street and Shady Place. This project also includes a reduction in the paved roadway width of South Beach Street, which includes 2085 feet (0.395 miles) of new pavement construction, milling and resurfacing, and curb and gutter construction. Other project elements include driveway reconstruction, minor drainage improvements associated with the trail project, roadway lighting, landscaping, and minor utility adjustments. All proposed improvements will be constructed entirely within existing right-of-way.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents