Reported 03/31/2022 12:00 AM
Project Title

Lab Interior Renovation

Physical Address View project details and contacts
City, State (County) Kearneysville, WV 25430   (Jefferson County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, supervision, materials, equipment and management to install, inspect, and test fume and exhaust hoods, cooling unit and features as specified, at USGS Eastern Ecological Science Center: Lab 234 - - Provide and install a new Loren Cook 850 CFM exhaust fan like existing roof mounted lab exhaust fans to include new roof curb. Provide crane to set new exhaust fan on roof. - This new fan will be ducted with 8" stainless steel duct to new Owner-furnished and installed fume hood. - Relocate existing return grill and duct to allow new fume hood duct to be installed. - Provide and install new 12" x 8" split stainless-steel hood at counter height w/ 4" stainless steel exposed duct up through ceiling and tie into existing 6" round stainless - steel snorkel duct. Include 4" balancing damper above ceiling. The existing tubes (2) cannot be run through the same duct. - Fore-pumps exhaust requirements: initial inrush flow – 10 L/min (21.2 ft3/h) continuous flow 7L/min (14.8ft3/h). API exhaust system flow rate up to 45L/min (95 ft3/h) - Provide and install a new 2-ton LG AC only wall mounted indoor unit connected to outdoor unit located on existing steel platform near cooling tower. System to include insulated refrigerant lines and pumped condensate line. The system should control temperature with-in a + or – 1 degree of setpoint (72 degree). - Provide and install a new 72-inch Hamilton fume hood with VAV controls matching existing 48-inch fume hood in color and operations.

Details

Laboratory, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents