Similar Projects
Last Updated | 02/17/2021 12:51 PM |
Project Title | Amphitheater Replacement Project at Community Park |
Physical Address | View project details and contacts |
City, State (County) | Montville, NJ 07045 (Morris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consist of the removal and disposal of the steel frame existing bandshell, construction of a new reinforced concrete retaining wall, and construction of a new timber frame amphitheater. The amphitheater shall be timber frame Douglas Fir, #1 & better, 48 feet wide at the front and 30 feet wide at the rear. The amphitheater shall be 22 feet tall at the front with 2x8 tongue and groove roof decking and a safety railing that meets the current building code. The amphitheater shall be as manufactured by The Barn Yard & Great Country Garages, 84 Stony Hill Road, Bethel, Connecticut, 06801 OR AN APPROVED EQUAL. Other items included in the project scope are the installation of a standing seam metal roof on the structure, stain finishing of the structure, installation of conduit for future electrical connections, installation of a pex water line, reinforced concrete pad beneath the structure, replacing concrete sidewalks and landscaping. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |