Similar Projects
I-80, Utica - Lincoln
Infrastructure
Post-Bid

Lotm Arterial Rehabilitation Project 700653 In No. 14Th Street From Adams To Superior (Ltu - Eng. Services)
Infrastructure
Post-Bid
Lincoln, NE 68509

Subdivision Chip Seal 2021
Alteration
Results
Firth, NE 68527

Yankee Hill Road Paving
Infrastructure
Results
Lincoln, NE 68509

Statewide On-Call Milling
Infrastructure
Post-Bid
Less than $5,000,000 est. value

Paving Project in South Folsom Street from Old Cheney to Palm Canyon
Infrastructure
Results
Lincoln, NE

Paving Project in Rokeby Road from 31street to 40th Street
Infrastructure
Results
Lincoln, NE 68512

Mill and Overlay in Yankee Hill Road From South 56th to South 70th Street
Infrastructure
Results
Lincoln, NE

Paving Project West Holdrege from North West 48th to Chitwood
Infrastructure
Results
Lincoln, NE 68509

I-80, Milford - Lincoln
Infrastructure
Results
$10,000,000 to $20,000,000 est. value

District 1 - Districtwide
Infrastructure
Results
$5,000,000 est. value

Holdrege at 104th Street Paving
Infrastructure
Results
Lincoln, NE 68527

North 140th Street Improvements
Infrastructure
Results
Waverly, NE 68462

LPS - South 70th and Carger Lane Public Infrastructure
Infrastructure
Results
Lincoln, NE 68516

Compost Facility Pavement Improvements
Infrastructure
Results
Lincoln, NE 68517

Last Updated 04/26/2022 08:05 AM
Project Title

Chip Seal 2022

Physical Address View project details and contacts
City, State (County) Hallam, NE 68509   (Lancaster County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chip Seal to be placed o n a prepared surface. Contractor shall insure surface is properly prepared before Chip Seal application. The contractor will apply CRS-2P Oil at the rate of 0.40 gallon per-square yard, and must meet the requirements shown in section 1032 of the NDOT Stan dard Specifications for Highway Construction Description of Locations (See location map) 1. N. 14th Street – Raymond Road to Ashland Road (6 miles) 2. N. 14th Street – Alvo to Raymond Road (5 miles) 3. N. 148th Street – O Street to McKelvie Road (5.74 miles) 4. W. Hallam Road – Hallam City Limits to SW 100th Street (3.46 miles)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents