Similar Projects
RFP D/B - Design/Build Services for HVAC Automation Control Upgrades
Renovation
Bidding
$3,685,500 CJ est. value
Stone Mountain, GA 30083

Coffee Campus Cooling Tower Replacement
Renovation
Bidding
$200,000 CJ est. value
Douglas, GA 31533

Awtrey Middle School HVAC Upgrade, Phase 2
Renovation
Sub-Bidding
$650,000 CJ est. value
Kennesaw, GA 30144

Berrien Middle School Corridor HVAC
Renovation
Sub-Bidding
$300,000 CJ est. value
Nashville, GA 31639

HVAC Maintenance
Alteration
Post-Bid
Metter, GA 30439

35 Broad Street Infrastructure Upgrades
Alteration
Post-Bid
Less than $1,400,000 est. value
Atlanta, GA

Design Build Services for The Replacement/Refurbishment of AHUs and Associated Fans
Results
GA

Courthouse HVAC
Alteration
Results
Ringgold, GA 30736

Rome High School Natatorium HVAC Renovation
Alteration
Post-Bid
$500,000 est. value
Rome, GA 30161

HVAC Replacement
Infrastructure
Results
Cumming, GA 30040

CCSD ERU Replacements
Alteration
Post-Bid
Evans, GA 30809

Multiple HVAC Replacements at Multiple County Locations
Alteration
Results
$377,606 est. value
Canton, GA 30114

On-Call HVAC Maintenance and Repair Services
Alteration
Post-Bid
Savannah, GA

Napoleon Fielder Recreation Center - Air Conditioning Replacement
Alteration
Results
Rome, GA 30161

HVAC Replacement for the Macon Housing Authority Central Office
Alteration
Post-Bid
Macon, GA 31201

Last Updated 04/28/2023 04:17 PM
Project Title

Meadowcreek High School - HVAC Modifications

Physical Address View project details and contacts
City, State (County) Norcross, GA 30093   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of replacement of outside air units with new Energy Recovery Units, including removal of related dehumidification water source heat pump units. Contract, if awarded, will be on a lump sum basis. Bids may not be withdrawn for a period of sixty (60) days after the date of receipt of bids. Bids shall be accompanied by a bid bond payable to Gwinnett County Board of Education in an amount equal to five percent of the base bid (Certified Checks NOT Acceptable). Performance Bond and Labor and Material Payment Bond, each amount equal to 100 percent of the contract sum, will be required of the successful bidder. These bonds shall be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of The Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A", with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. The Owner will make progress payments to the successful contractor upon receipt of request for payment having been certified by the Architect as fully covered and shown in Contract Documents. All Pre-Qualified Bidders for this project shall attend the Pre-Bid Conference. FAILURE TO ATTEND SHALL RESULT IN DISQUALIFICATION OF THE BIDDER. Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre- Construction meeting as soon as all required paperwork such as Contracts, Bonds, Insurance, etc. are in order. Contractor shall mobilize within ten (10) days of Notice to Proceed. All construction must be substantially complete by July 21, 2023. Plans and specifications will be released only to Contractors who have been Pre-Qualified by the Owner. Obtain documents by sending an email to mike@spurlock-eng.com and copy drake@spurlockeng.com. Bid deposits are non-refundable. The above description is an advertisement for the submission of bids which are to be considered as offers for performance of work by the submitting party. The Owner reserves the right to accept or reject any or all bids and to waive technicalities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents