Similar Projects
West Canal Leakage Abatement - City of New Britain
Infrastructure
Conception
$200,000 est. value
New Britain, CT

Community Connectivity Grant Program - Old Wethersfield Safety Improvements
Infrastructure
Bidding
$220,000 est. value
Wethersfield, CT 06109

Route 75 (Poquonock Avenue) Culvert Rehabilitation - Intersection of Holcomb Hill Road
Infrastructure
Bidding
$200,000 to $500,000 est. value
Windsor, CT 06095

Trench Restoration 2021
Post-Bid
Southington, CT

Exterior Lighting Upgrade and Site Improvements at Elms Village Apartments
Alteration
Post-Bid
East Hartford, CT

Springside Avenue Drainage Outfall Replacement
Results
East Hartford, CT 06108

Pequabuck River Conduit - Culvert Rehabilitation
Results
Bristol, CT 06010

Drainage Improvements - 2021 Mill and Pave Project
Infrastructure
Post-Bid
Suffield, CT

Flood Control System Main Street Levee Closure Structure Repairs
Results
Hartford, CT

Detention Pond Inspection and Cleaning
Infrastructure
Post-Bid
Southington, CT

2021 Storm Drainage Installation and Repair
Term Contract
Results
West Hartford, CT

Thompsonville Road/Cassotta Lane SSES Pipeline Rehabilitation
Infrastructure
Post-Bid
Suffield, CT 06078

Roadway Reconstruction/ Storm Drainage and Miscellaneous Work at Various Locations
Results
Bristol, CT

Silver Creek East Branch Channel Restoration Project
Infrastructure
Post-Bid
Bristol, CT

Hartford Levee Maintenance
Renovation, Term Contract
Results
Hartford, CT

Reported 07/01/2022 02:48 PM
Project Title

Whigville Dam Drainage Improvements - City of New Britain

Physical Address View project details and contacts
City, State (County) New Britain, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The drainage system at Whigville Dam is integral to the dam structure and is over 100 years old. The drainage system contains valves which are broken and is in need of replacement in order to properly maintain the dam structure. As of June 30, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents