Similar Projects
Master As-Needed Agreement M16 Roofing Services
Alteration
Post-Bid
$700,000 est. value
San Francisco, CA

Roof Replacements Projects A and B
Alteration
Post-Bid
$55,000 est. value
Big Sur, CA 93920

Roof Replacement Guy Fleming Residence
Alteration
Results
La Jolla, San Diego, CA 92037

Storm Water Pump Station Roof and Facilities Improvements
Alteration
Results
$575,000 est. value
Huntington Beach, CA 92648

Merced High School 200 Wing (Rooms 201-208) Reroof
Alteration
Post-Bid
Merced, CA 95348

Roof Repair and Replacement at Various Sites
Alteration
Results
Pacifica, CA 94044

Atwater High School - L Wing (Rooms 121-129) Reroof
Alteration
Post-Bid
Atwater, CA 95301

MLK Recreation Center Moisture Intrusion
Renovation, Alteration
Results
$916,000 est. value
San Diego, CA 92101

Roof Replacement Services
Alteration
Post-Bid
$4,365,738 est. value
Corcoran, CA 93212

Balboa Park Federal Building Improvement
Alteration
Results
$1,140,000 est. value
San Diego, CA 92101

Roof Replacement, Art Center, Building 1A
Term Contract
Post-Bid
$490,000 est. value
CA

Hamilton Elementary School and San Jose Middle School Roofing Project
Alteration
Results
Novato, CA 94949

Police Headquarters Lobby Roof and HVAC Rehabilitation
Term Contract
Post-Bid
Orange, CA 92867

Half Moon Bay High School Roofing
Alteration
Results
Half Moon Bay, CA

Roofing Project - Hollyvale Innovation Academy
Alteration
Post-Bid
Victorville, CA 92392

Last Updated 07/10/2023 09:07 AM
Project Title

City Hall Roof Replacement Project

Physical Address View project details and contacts
City, State (County) Shafter, CA 93263   (Kern County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $149,002 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000322497 Question Acceptance Deadline 06/23/2023 08:00 PM EDT Questions are submitted online No Bid Intent Not Available The project involves removing and replacing the existing tile roof at the Shafter City Hall with new Mission S Style tiles. The project includes but is not limited to replacing tile, underlayment, facia boards, wood roof sheeting, installing new roof vents, and minor painting. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % The Engineer's Estimate for this project is $175,000-225,000.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents