Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

AZ FLAP 202(2) Red Cloud Mine Road
Design
$1,500,000 to $2,500,000 est. value
Yuma, AZ

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

AZ Flap 439(1) & 202(1), Martinez Lake & Red Cloud Mine Road
Results
Yuma, AZ

Zocalo Gardens Phases 2 and 3 Water Main and Roadway Improvements
Results
Somerton, AZ 85350

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Highway 95 and Engler Avenue Intersection Improvements Project
Results
$900,000 est. value
Yuma, AZ 85365

County 16th Street to County 18th Street Intersection Improvements Project
Results
Yuma, AZ 85364

Pavement Rehabilitation
Results
Less than $17,500,000 est. value
Yuma, AZ 85364

Failed Septic Tank Replacements
Results
Somerton, AZ 85350

Asphalt Sealant and Services
Term Contract
Results
Yuma, AZ

Pavement Preservation Services
Term Contract
Results
Less than $300,000 est. value
Yuma, AZ

AZ FTBR Levee Road (1) Pave Levee Road
Results
$1,000,000 to $2,000,000 est. value
Yuma, AZ 85364

Catalina Drive and Palo Verde Street Pavement Replacement
Results
Yuma, AZ

Last Updated 02/01/2021 05:49 PM
Project Title

Fulton St. and Council Avenue Sewer Main and Roadway Improvements Project

Physical Address View project details and contacts
City, State (County) Somerton, AZ 85350   (Yuma County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of, but is not limited to: ? New 3" AC over 8" of ABC structural section. New 6" C-900 Class 235 (DR-18) PVC Water Main. New residential service lines. New water valves, boxes and covers. New Fire Hydrants. New ADA Sidewalk Ramps. New Roll Curb, 4" Sidewalk and Valley Gutter Sections. Raise Utilities to New AC.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents