Similar Projects
Resurfacing
Bidding
$5,484,117 est. value
FL

Front Beach Road Segment 4.1 Powell Adams
Bidding
Panama City Beach, FL 32413

Restore Maintenance Road GATR Site
Post-Bid
Panama City, FL

Repair Restore Expeditionary Road
Post-Bid
Panama City, FL 32403

Street Resurfacing Project - FY 2019
Results
Less than $743,500 est. value
Panama City Beach, FL

Bituminous Courses
Results
Less than $524,707 est. value
FL

S. Silver Lake Road Dirt Road Stabilization Project
Bidding
FL 32438

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Hugh Thomas Drive Improvements
Results
Callaway, FL 32404

City-Wide Street Repairs
Post-Bid
Mexico Beach, FL

Widen/Resurface Existing Lanes/Sidewalk
Results
Less than $505,626 est. value
FL

Street Resurfacing Project FY 2021
Post-Bid
Panama City Beach, FL 32413

Roadway Repairs
Results
Less than $980,825 est. value
Lynn Haven, FL

Wildwood Road Improvements
Post-Bid
Less than $422,000 est. value
Panama City Beach, FL 32407

Roadway Repairs
Results
Less than $520,705 est. value
Callaway, FL

Last Updated 12/15/2020 02:24 PM
Project Title

Restore Crooked Island Access, Tyndall AFB

Physical Address View project details and contacts
City, State (County) Panama City, FL 32403   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of a effort to restore the access roads and parking area going to Crooked Island Beach. A large portion of Crooked Island Beach Road was washed away due to Hurricane Michael. There is now a standing pond/lake covering a large portion of the road. This has lead to dangerous conditions for any personnel who attempt to utilize the road. Restoring the road will allow for safe usage of the road. The pond currently occupying part of the road will be filled in a way so as to not washout again and to provide a level surface to re-establish the road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents