Similar Projects
Last Updated | 03/30/2021 03:03 AM |
Project Title | Construction of Harbor Palms Infrastructure Project Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Oldsmar, FL (Pinellas County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish all labor, materials, equipment, hardware, and incidentals to complete the Work specified within the Technical Specifications and Technical Drawings, which are part of this contract, associated with the Harbor Palms Infrastructure Project – Phase 2. The major elements of this Contract include the construction of new water mains including service connections and other appurtenances, replacement and upgrades to sidewalks and roadways, and upgrades to the underdrain. Work includes directionally drilling of high density polyethylene (HDPE) and open cutting of polyvinyl chloride (PVC) water mains, valves, and fittings; milling and resurfacing and full depth reconstruction of existing asphalt roads; pouring of concrete curb, gutters, driveways, and sidewalks; installation of new stormwater pipes as directed on the Drawings; grouting and filling of all abandoned piping; providing signs and thermoplastic street markings. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |