Project Title | Laurel Elementary School Flooring Replacement - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | San Mateo, CA 94403 (San Mateo County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $388,346 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To bid on this Project, the Bidder is required to have been prequalified by the District. To bid on this Project, the Bidder is required to have been prequalified by the District. Pre-qualification for all bidding General Contractors and Sub-Contractors is to be through Quality Bidders at In addition, if the Project has flooring, electrical, mechanical, or plumbing components that will be performed by subcontractors performing under the following license classification (s), C-4, C-7, C-10, C-15, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46. then each of those subcontractors that intend to bid as a first-tier subcontractor to a general contractor (prime contractor) are required to have been prequalified by the District, through Quality Bidders at website Prior to the bid, a minimum of five days before bids are received the District will issue by Bid Addendum all SubContractors pre-qualified through Quality Bidders. All pre-qualification questionnaires will be received until 4:00 P.M., April 14th, 2023, through Quality Bidders using their website. Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder. 5. The project consists of the following scope of work as indicated: Bid Package #2 - SMFCSD Bid No.: 23-210 - LAUREL ELEMENTARY SCHOOL As per specified locations and construction specifications provided by the District, the project consists of all labor, materials, equipment and services necessary to complete the following scope: Abatement of areas as required (See report - Scope description) Demo and remove the existing carpet, VCT/LVT and wall base Furnish and Install specified moisture barrier system and provide proper floor preparation for all existing concrete subfloor areas receiving new flooring Furnish and Install new specified entry walk off carpet tile, resilient plank flooring, resilient sheet flooring, top set coved wall base and all related sundries and accessories. Request for Information (RFI's) and Bid period questions relative to the building projects are to be submitted to Billy Tran, SMFCSD Staff, btran@smfcsd.net Question Deadline 04/27/2023 at 4:00 PM PT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |