Similar Projects
RFP - Highway 236 / Dennett Road Hydrologic Watershed Study
Term Contract
Bidding
Kittery, ME 03904

RFP - Comprehensive Plan Update
Term Contract
Bidding
$35,000 CJ est. value
Eliot, ME 03903

HUD Nationwide Construction Inspection Services
Term Contract
Post-Bid
Less than $50,000,000 est. value

HUD Nationwide Construction Inspection Services
Term Contract
Post-Bid
Less than $50,000,000 est. value

Project Management, Construction Engineering and Inspection, and Public Outreach Assistance for the Route 236 Water-Sewer Project
Infrastructure
Results
Eliot, ME

RFP - Annual Dam Inspection for the Stroudwater Dam
Term Contract
Bidding
Portland, ME 04106

Resident Inspector Services for Congress Square Improvements
Term Contract
Post-Bid
Portland, ME

RFP - Maple Street Sewershed Analysis for CSO Reduction
Term Contract
Bidding
$150,000 CJ est. value
Portland, ME 04101

Manhole Inspection Program II
Term Contract
Post-Bid

RFP - Consulting Services for Comprehensive Plan Upgrade
Term Contract
Bidding
Pittsfield, ME 04967

Tri - Annual Testing
Infrastructure
Post-Bid
Augusta, ME 04330

RFP - Early Childhood Education Childcare Center 2023
Term Contract
Bidding
Presque Isle, ME 04769

RFP - Fort Williams Park Goddard Mansion Stabilization Feasibility Study
Term Contract
Post-Bid
Cape Elizabeth, ME 04107

2022 Contract for Planning Services
Infrastructure
Post-Bid
Lisbon, ME

RFP - Architectural Survey
Term Contract
Post-Bid
Bangor, ME 04401

Last Updated 02/02/2023 03:47 PM
Project Title

RFP - Fort Williams Park Pond Feasibility Study

Physical Address View project details and contacts
City, State (County) Cape Elizabeth, ME 04107   (Cumberland County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected December 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Fort Williams Park Committee completed a Master Plan Update for Fort Williams Park in the fall of 2021. The plan is available on the Town of Cape Elizabeth website for review. Fort Williams Park Master Plan Update. One recommendation from the Master Plan was the improvement of the freshwater pond located at Fort Williams Park. The Town of Cape Elizabeth is soliciting feasibility proposals to review the existing conditions and historical context of the pond, develop a list of repairs to improve the year round function of the pond, review pond hydrology, and develop associated costs for implementation of the enhancements. The existing freshwater pond is located on the westerly side of the Fort Williams Park. The Fort Williams Park Committee would like to explore various creative concepts that identify improvements and establishes the multi-season use of the pond. The work will include, but not be limited to, the following scope of services: 1. Project Initiation and Data Collection, including base mapping of the pond and peripheral area. 2. Site Inventory, Analysis and Assessment, including requirements needed from Maine DEP and Army Core of Engineers, if required. 3. Review of historic documents and photos that were found in the data collection phase. 4. Prepare a preliminary hydrologic assessment to determine tributary area, surface runoff to the pond, the pond pump system and the pond outlet pipe. 5. Work with the FWPC to discuss options and prioritize repairs and enhancements to the pond and immediate surrounding areas. 6. Present a preliminary plan of next steps, including a list of recommended repair and maintenance items, along with an estimated cost to complete each task. 7. Attend meetings of the FWPC and other Town boards as requested. 8. Produce documents and plans for review and submission to the Planning Board, the Town Council and/or any applicable Town/State/Federal agency. 9. Ability to provide documents and plans in preparation for competitive bidding procedures. 10. Provide construction oversight and management for any applicable project, or contracted services if requested. This list is intended to assist design professionals in understanding the scope of the project, however, the FWPC is very interested in receiving advice from interested professionals that may not include or is not limited to the list. Conflict of Interest The firm selected shall disclose to the Town Manager any previous (or current) relationship with clients, with proposals before the Town. At times when a conflict of interest is possible the Town of Cape Elizabeth may seek other services for specific project review and/or oversight. Criteria for Firm Selection 1. Relevant experience of principles and key staff 2. Firm's history of performance on previous projects relevant to services being desired. 3. Adequacy of personnel and support services (in-house and/or contracted) to perform work. 4. Completeness of proposal. 5. Fee schedule. 6. Recommendations and opinion from firm's previous clients. 7. A record of achievement utilizing historical, environmental and passive recreation measures in parks/recreation projects. 8. Other factors deemed pertinent by the FWAC and Town staff. Information Requested 1. Firm History 2. Resumes of personnel who will work with the FWPC and Town staff. 3. The names of companies that will be utilized for services not provided by the submitting firm. 4. Identification of key contact and person you wish to be identified as the Fort Williams Park Committee "Liaison" in the firm. 5. List of representative clients 6. Current fee schedule. Questions regarding this bid should be directed to Kathleen Raftice, Director of Community Services and Fort Williams Park at 207-799-2868 or via email at Kathleen.Raftice@capeelizabeth.org. The Town of Cape Elizabeth expects to award this bid to the lowest bidder for the services requested however the Town shall award the contract to the proposal that best accommodates the various project requirements. The Town of Cape Elizabeth reserves the right to waive any informality in the bids, to accept any bid and to reject any or all bids, should it deem in the best interest of the Town to do so. The Method of Contractor Selection has not been determined at this time.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents