Similar Projects
Weed Abatement Services
Alteration
Post-Bid

Turf Removal
Alteration
Post-Bid
Barstow, CA 92311

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Valley Blvd/Kaiser Sewer Project
Infrastructure
Results
$65,703,050 est. value
Fontana, CA 92335

CHP Needles Area Office - Landscape Maintenance Services
Alteration
Post-Bid
Needles, CA 92363

Sewer Main Lining Various Locations
Infrastructure, Alteration
Results
$1,600,000 to $1,800,000 est. value
Victorville, CA 92392

Landscaping Upgrades
Alteration
Post-Bid
Loma Linda, CA 92357

Sewer Reline at Various Locations
Infrastructure, Alteration
Results
$1,369,850 est. value
Chino, CA 91710

S208--Landscaping Upgrades for LVAHCS Campus
Term Contract
Post-Bid
Loma Linda, CA 92357

Yorba Avenue and Eucalyptus Avenue Sewer Main Replacement Project
Infrastructure
Results
$3,026,030 est. value
Chino, CA 91710

Landscape Maintenance Services at Hillside Memorial Park Cemetery
Term Contract, Alteration
Post-Bid
$60,000 est. value
Redlands, CA 92373

Roadway Excavation, Desert Tortoise Fence, and Bonded Fiber Matrix.
Alteration
Results
$15,000,000 est. value
CA

Weed Abatement Services
Alteration
Post-Bid

Upgrade Irrigation Controllers (Wall Mounted)
Infrastructure
Results
$350,000 est. value
CA

On Call Sewer Collection System Repair Services
Infrastructure
Post-Bid
Redlands, CA 92373

Reported 06/02/2022 12:00 AM
Project Title

Right of Way Maintenance and Storm Cleanup

Physical Address View project details and contacts
City, State (County) Apple Valley, CA   (San Bernardino County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Landscaping/Irrigation, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of providing necessary labor, equipment and materials to perform right of way maintenance and storm cleanup for one year (July 1, 2022 - June 30, 2023), with the potential to extend the contract up to four (4), one (1) year extensions of extended maintenance.

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents