Similar Projects
Hedgesville High School SBA Needs Improvement Project
Alteration
Conception
$5,952,000 est. value
Hedgesville, WV 25427

Arts & Cultural Facility Renovation
Renovation, Alteration
Design
Weston, WV

Roof Replacement for the Scott High School Fieldhouse
Alteration
Bidding
$686,000 est. value
Madison, WV 25130

Grafton High School Roof Replacement
Alteration
Bidding
$1,500,000 est. value
Grafton, WV 26354

Claymont Mansion Roofing Repairs
Post-Bid
Charles Town, WV 25414

West Virginia School of Osteopathic Medicine Main Building Roof Replacement
Post-Bid
Lewisburg, WV 24901

Carter Hall and Van Meter Roof Replacement
Results
Morgantown, WV 26506

Chelyan Salt Building Roof Exit 85
Results
Charleston, WV 25306

Historic Building Roof Removal & Replacement
Renovation
Post-Bid
Harpers Ferry, WV 25425

MET Theatre Roof Repair
Results
Less than $277,165 est. value
Morgantown, WV 26505

Roof Replacement at the ADA Wastewater Treatment Plant Garage
Post-Bid
Bluefield, WV

Hawks Nest State Park CCC Restrooms and Gift Shop Roof Rehabilitation
Results
Ansted, WV 25812

Roof for Cabwaylingo Trailhead and Maintenance Building
Post-Bid
Man, WV 25635

Roof Replacement - Western Regional Juvenile Center
Results
Barboursville, WV

Roof Replacement and Masonry Repair
Post-Bid
Beverly, WV

Reported 06/23/2022 12:00 AM
Project Title

Robert C. Byrd Clinic Roof Replacement

Physical Address View project details and contacts
City, State (County) Lewisburg, WV 24901   (Greenbrier County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of approximately 14,925 SF of EPDM roof membrane and insulation down to the existing metal deck on the original building--not the additions. The existing standing seam metal roofing and rooftop equipment are to remain. The new work will consist of installing 3"rigid insulation over the existing metal deck and adhering 60-mil EPDM roof membrane along with all associated metal flashing.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents