Project Title | Airstrip Well Interconnection Project |
Physical Address | View project details and contacts |
City, State (County) | Center Barnstead, NH (Belknap County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Install raw water transmission line in Center Barnstead, NH. Scope of work shall consist of: 1. Directional drill 1,250` of 8" HDPE sleeve beneath Locke Lake with a 3" HDPE line installed within the sleeve. 2. Install approximately 1,300` of 4" C900 PVC raw water transmission main to be connected to 3" HDPE. 3. Install approximately 250` of underground electrical conduit. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |