Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

North Water Reclamation Facility Storage Expansion
Addition
Conception
$453,000 est. value
Palmetto, FL 34221

Northwest Wastewater Plant Operations Building
New Construction - 1,500 SF
Design
$8,000,000 to $10,000,000 est. value
Tampa, FL

Flagler Beach Wastewater Treatment Plant
New Construction
Design
Flagler Beach, FL

Design-Build - Iron Bridge Regional Water Reclamation Facility Grit Removal System
Renovation
Bidding
$300,000 est. value
Orlando, FL

Waste Water Treatment Facility Improvements - Phase 2
Renovation
Bidding
$300,000 est. value
Davenport, FL 33837

Wastewater Treatment Facility Filter No. 2 Replacement
Post-Bid
Less than $625,000 est. value
Port Saint Lucie, FL 34986

Wastewater Treatment Facility Improvements Phase 1
Post-Bid
Less than $4,900,000 est. value
Davenport, FL

Northview High School - Wastewater Treatment Plant
Results
$600,000 est. value
Century, FL 32535

Clarifier Rehabilitation Project
Results
Immokalee, FL 34142

Greenland Water Reclamation Facility (WRF)
Construction
$100,000,000 est. value
Jacksonville, FL 32202

Airport Water Reclamation Facility Phase III Expansion
Construction
Brooksville, FL 34613

Waste Water Treatment Facility Expansion
Addition
Pending Verification
Clermont, FL

Lake Hamilton Phase 1 Wastewater Treatment Facility
Renovation
Bidding
$700,000 est. value
Lake Hamilton, FL

Construction Package ST-2D-B South District Wastewater Treatment Plant Substations 5/6 and 15/16
New Construction
Post-Bid
$22,382,300 est. value
Miami, FL 33170

Reported 07/08/2022 12:00 AM
Project Title

Upgrade Existing Control System Cryogenic Oxygen Plant

Physical Address View project details and contacts
City, State (County) Hollywood, FL 33020   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade the existing control system at the cryogenic oxygen plant including replacement of the existing APCI control system located at the City’s wastewater treatment plant Cryogenic Oxygen Facility, located at the South Regional Wastewater Treatment Plant located at 1621 North 14th Avenue, Hollywood, Florida 33020

Details

Sewage Treatment Plant, Renovation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Odor Control, Water Pollution Control Equipment, Waste Thermal Processing Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents