Similar Projects
Del Webb Server Room
New Construction
Conception
Salem, OR 97301

Nick Wilson Memorial Plaza - 97027 - City Of Tigard
New Construction, Infrastructure
Conception
$650,000 CJ est. value
Tigard, OR 97223

Universal Plaza
New Construction
Design
Tigard, OR 97223

Wetland Complex
New Construction
Design
$45,000,000 est. value
Redmond, OR

Major General George White SIPR Room Upgrades
Build-out, Renovation
Bidding
$75,000 CJ est. value
Salem, OR 97301

Grease Interceptor Project
Renovation
Bidding
$64,000 CJ est. value
Sandy, OR 97055

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Capital Improvements Baker City Employment Office
Renovation
Results
$845,500 est. value
Baker City, OR 97814

Block 67 Redevelopment
Renovation
Results
Hillsboro, OR

Metro Regional Center (MRC) Seismic Retrofit - PSTBD042 - Metro
Renovation
Conception
$2,250,000 CJ est. value
Portland, OR 97232

New Homeless Shelter
New Construction - 7,423 SF
Design
$270,000 est. value
Roseburg, OR 97470

Building V and W Roof Replacement and Exhaust Fan Upgrades
Renovation
Bidding
$290,000 CJ est. value
Salem, OR 97301

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

USPS IQ JOC Oregon
New Construction, Renovation
Results
Less than $10,000,000 est. value

Last Updated 09/07/2022 10:04 AM
Project Title

La Grande Armory Secure Internet Protocal Room (SIPR) Room Upgrades

Physical Address View project details and contacts
City, State (County) La Grande, OR 97850   (Union County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the ITB is to establish a Contract for La Grande Armory SIPR Room Upgrades for the benefit of Oregon Military Department (OMD). The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents The following range is a project estimate for bonding purposes only: $65,000 to $75,000.00 LOCATION OF WORK: La Grande Armory 404 12th St. La Grande, Oregon 97850 Union County PROJECT START DATE: 15 calendar days from issuance of Notice to Proceed. SUBSTANTIAL COMPLETION: 120 calendar days from issuance of Notice to Proceed FINAL COMPLETION: 180 calendar days from issuance of Notice to Proceed The project upgrades existing SIPR room to meet the current security requirements. This will require demolition of current walls and ceiling. Add the necessary layers of materials to meet the current security requirements to the new walls and ceiling. All surfaces must be finished with primer and paint to match existing colors. Work to be performed shall include but will not be limited to the following: o Current walls and ceiling are to be removed in the existing SIPR room, room # 109. o Existing door and frame to be removed, current CDX combination lock Shall be disposed of per DoD Lock Program protocol. Instructions to be provided upon contract award. o Walls shall be reconstructed in room #109 as follows: A 5/8 inch-thick plywood layer shall be attached directly to the wall studs on the interior and covered with the layer of 5/8 inch thick wallboard. The plywood shall be continuously glued and screwed to the studs every 12 inches along the length of each stud and at the ceiling and floor. Ceiling construction to follow the same guidelines as the walls. o Walls and ceiling are to be insulated for sound attenuation to 30-45db. Acoustic fill and insulation shall be placed between the studs in a manner which prevents any slippage. o All walls and ceiling are to be finished and painted floor to ceiling to match existing finishes. o New Cove base to be installed after painting is completed, color to match existing cove base throughout the building. o HVAC penetrations shall not be larger than 96 square inches. o All current electrical in walls is to be extended to new finished wall surface. o Install dedicated 120V, 20amp circuit for Network cabinet. This additional electrical circuit shall be pulled in from room 122 and be in conduit its entire length with compression type connectors o Install metal fire door, 16 gauge, rated to UL 10-UL 10C-NFPA 252 standards for 3 hour rated at 650 degrees. Door and door seals shall provide correct level of sound attenuation to prevent conversations from being overheard on the exterior of the door/room. o Install New metal door frame and Jam with same fire rating as the door, welded metal. o Existing daylight window at existing door to be removed and wall infill as noted above with additional exterior 5/8 wall board. Exterior finish shall match the existing adjacent wall and paint shall blend to match existing wall with a seamless appearance. o Install CDX10 combination lock on the door. CDX-10 hardware configuration shall have an interior exit device and be of the same fire rating as the new door. DOJ Approved 7-27-22 Version ITB 200067C002 Page 46 of 49 o IDS detection Exterior annunciator shall be mounted on the exterior wall of the SIPR near the top of the door. o Surface mounted conduits with in the SIPR for IFR motion detector and balanced magnetic switches at the entry door. o IDS Equipment installation per the attached drawing and equipment list. o No openings in the ceiling or walls shall exceed 96 square inches and will have appropriate sound attenuation/baffling to prevent sound transfer through the opening. "All rights and remedies available to Owner under applicable federal, state and local laws are also incorporated by reference herein and are cumulative with all rights and remedies under the Contract."

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents