Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Bidding
$828,757 est. value
Ontario, CA 91761

Roadway Excavation, HMA (Type A) with Class 2 AB, RCB Culvert and RCP
Infrastructure
Bidding
$40,000,000 est. value
CA

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Post-Bid
$22,300,000 est. value
CA

Smooth Streets Program
Infrastructure
Post-Bid
San Mateo, CA

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

2021 Northern Region Road Rehabilitation: Phase 2
Infrastructure
Results
$650,000 est. value
CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

HMA Overlay and Replace AC Surfacing
Infrastructure
Bidding
$1,010,000 est. value
CA

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Post-Bid
Victorville, CA

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

Ac Overlay Phase Two
Infrastructure
Bidding
$7,700,000 est. value
Sacramento, CA

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

2021 Road Sealant, Phase 2
Infrastructure
Results
CA

Last Updated 12/02/2021 02:00 PM
Project Title

Main Road Construction

Physical Address View project details and contacts
City, State (County) Tulelake, CA   (Siskiyou County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to rehabilitate, restore, and resurface (3R), up to approximately 28.8 kilometers (km) (17.9 miles) of main road. All existing paved pull-outs, parking areas, and overlooks will also be included, and the current unstable cinder road shoulders will be rehabilitated to improve safety and reduce extensive maintenance.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents