Similar Projects
Professional Engineering Services - Development of a Wastewater Collection and Treatment System Master Plan
Infrastructure
Bidding
Helena, MT

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

Water Distribution And Wastewater Collection System Controls Upgrade
Infrastructure
Results
MT

Professional Engineering Services - Development of bypass Pumping Facilities at Three of the District's Lift Stations
Infrastructure
Bidding
Kalispell, MT

2021 Housing Requirements and Market Analysis (HRMA) for Altus AFB, Edwards AFB, Eglin AFB, Royal Air Force Fairford, Malmstrom AFB, Mountain Home AFB, and Osan Air Base
Post-Bid
Altus, OK 73522

Design and Construction for the PSD Building Plan Project
New Construction, Infrastructure
Bidding
Polson, MT 59860

General Contract/Construction Manager Services for New Airport Terminal Yellowstone Airport
New Construction, Infrastructure - 38,000 SF
Post-Bid
West Yellowstone, MT

Environmental Natural Resources - Construction
Infrastructure
Bidding
Helena, MT

Professional Services for PLSS Survey Control Point Collection in Columbia Falls and Whitefish
Alteration
Post-Bid
MT

Water Reclamation Facility On-call Engineering Services
Infrastructure
Post-Bid
Bozeman, MT 59715

Water Treatment Plant On-call Engineering Services
Infrastructure
Post-Bid
Bozeman, MT 59715

Engineering Design, and Construction Management Services
Infrastructure
Post-Bid
Whitefish, MT 59937

Engineering Services
Infrastructure
Post-Bid
Lakeside, MT 59922

Reported 11/25/2021 12:00 AM
Project Title

Engineering Services - Flathead County Septage Treatment and Biosolids Composting Facility

Physical Address View project details and contacts
City, State (County) MT   (Flathead County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed scope of work includes professional services related to the design, bidding, construction administration, and construction observation for a new Flathead County Septage Treatment and Biosolids Composting Facility. It is anticipated that the work will be completed in two phases as follows: Phase 1 (30% Design): The persons/firm selected will provide consultative and engineering services necessary to identify an appropriate site and provide initial design (approximately 30%) for a septage treatment and composting facility to serve Flathead County. This is a collaborative project between Flathead County, the three municipalities (Kalispell, Whitefish, and Columbia Falls), and some or all of the county water and sewer districts. It is anticipated that the Phase 1 services will specifically include the following items: 1. Alternative analysis and selection of the septage treatment and biosolids composting processes. 2. Development of sizing design criteria for all major treatment processes. 3. Identification of potential sites to locate the facility and development of a recommended alternative. 4. Development of a final site plan for the recommended facility. 5. Development of a detailed project cost estimate based on the recommended treatment processes and recommended site. 6. Development of a financial evaluation and business plan based on estimated costs and fees. 7. Assistance with land acquisition. 8. Coordination with Flathead County, the three municipalities, and water and sewer Districts within the County. 9. Development of Preliminary Design Report and 30% set of construction drawings. 10. Funding assistance and grant administration, if needed At the sole discretion of Flathead County, the consultant selected for Phase 1 may be retained to provide professional services for Phase 2, which includes the following scope of work. Phase 2 (Final Design, Bidding, Construction Administration, and Project Closeout): The Phase 2 services include, but may not be limited to, the following major items of work. 1. Preparation of Final Construction Drawings and Specifications 2. Coordination with DEQ 3. Obtaining necessary permits required for construction 4. Project Bidding 5. Construction Administration and Observation 6. field Commissioning, System Startup and Operator Training 7. Project Closeout and As-recorded Drawings 8.Preparation of an Operation and Maintenance Manual 9. Funding assistance and grant administration, if needed

Details

Division 11 - Equipment, Solid Waste Handling Equipment, Composting Equipment.
Division 46 - Water and Wastewater Equipment, Screening Equipment, Septage Receiving Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents