Similar Projects
Annual Contract/Painting and Weatherproofing
Term Contract
Bidding
FL

Palm Beach County Sheriff's Office Exterior Hardening
Post-Bid
West Palm Beach, FL

CM-at-Risk Services - Architecture Building Exterior Envelope Repair
Post-Bid
Less than $5,000,000 est. value
Gainesville, FL

Sunshade Structure - EPA Gulf Breeze, FL
Results
Gulf Breeze, FL 32561

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

UCF Downtown/Dr. Phillips Academic Commons
Construction
$66,000,000 est. value
FL

Lee County Downtown Jail Corridor Ceiling Replacement
Construction
Fort Myers, FL 33901

54--Building Roof Top Guardrail System
Post-Bid
Panama City, FL 32407

TGK Facility Re-Roof - Pressure Wash and Seal Exterior Building
Results
Less than $3,350,000 est. value
FL

Awning Repair, Recover and Install
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34235

N--Service: Recover Awnings Building 2 and 42
Results
Tampa, FL 33612

Exterior Painting Projects for Vernon E. Hargray Youth Enrichment Center and Sunset Lakes Community Center
Post-Bid
Miramar, FL 33025

UCF Spectrum Stadium Rust Remediation
Results
Orlando, FL 32816

Gutter Replacement
Post-Bid
Palm Harbor, FL 34683

Facility Maintenance Services for Cecil Airport
Results
Jacksonville, FL 32221

Last Updated 06/03/2020 03:32 PM
Project Title

Design Build Services for Canopy Covered Walkways at Relocatable Classrooms and Other Selected Locations throughout the District

Physical Address View project details and contacts
City, State (County) Viera, FL 32940   (Brevard County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Design Build Services to deliver canopy covered walkways to, from and among relocatable classrooms. The 2014 facility assessment identified schools where canopies were needed. However, since that time, Portables have been relocated and the scope of the project will need to include all portables that are in use as classrooms. The preconstruction phase of the project will include a review of all sites where this work is needed. Although the sales surtax budget established for this project in 2014 was $5.7 million, additional capital resources are anticipated to address all portables that will be used as classrooms in the 2020-2021 school year. The scope of work may include additional canopy locations as may be directed by the School Board.

Details

Division 05 - Metals, Tension Rod and Cable Truss Assemblies, Canopy Support Truss Assemblies.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents