Last Updated 09/02/2021 12:21 AM
Project Title

FM 665 - Hazard Elimination and Safety

Physical Address View project details and contacts
City, State (County) TX   (Nueces County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,590,611
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 67.000 1 104 6010 Removing Conc (Riprap) Cy 8.000 2 104 6017 Removing Conc (Driveways) Sy 356.000 3 112 6002 Subgrade Widening (Dens Cont) Sta 67.000 4 134 6004 Backfill (Ty A Or B) Sta 511.000 5 247 6041 Fl Bs (Cmp In Plc)(Tya Gr1-2)(Fnal Pos) Cy 4,647.000 6 251 6121 Rework Bs Mtl (Ty C)(7")(Dens Cont) Sy 23,022.000 7 275 6001 Cement Ton 168.000 8 275 6011 Cement Treat(Exist Matl)(8") Sy 25,264.000 9 316 6001 Asph (Multi Option) Gal 63,577.000 10 316 6029 Asph (Rc-250) Gal 5,588.000 11 316 6226 Aggr(Ty-Pb Gr-5 Sac-B) Cy 178.000 12 316 6427 Aggr(Ty-Pb Gr-4s Or Ty-Pb Gr-4)(Sac-B) Cy 1,653.000 13 354 6021 Plane Asph Conc Pav(0" To 2") Sy 4,609.000 14 400 6005 Cem Stabil Bkfl Cy 73.000 15 401 6001 Flowable Backfill Cy 14.330 16 432 6001 Riprap (Conc)(4 In) Cy 40.800 17 432 6045 Riprap (Mow Strip)(4 In) Cy 26.000 18 464 6003 Rc Pipe (Cl Iii)(18 In) Lf 821.000 19 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 68.000 20 464 6007 Rc Pipe (Cl Iii)(30 In) Lf 20.000 21 464 6009 Rc Pipe (Cl Iii)(42 In) Lf 80.000 22 467 6106 Set (Ty I)(S=3 Ft)(Hw=3ft)(4:1)(C) Ea 2.000 23 467 6109 Set (Ty I)(S=3 Ft)(Hw= 3 Ft)(6:1)(C) Ea 14.000 24 467 6141 Set (Ty I)(S= 4 Ft)(Hw= 3 Ft)(6:1) (C) Ea 6.000 25 467 6173 Set (Ty I)(S= 5 Ft)(Hw= 3 Ft)(6:1) (C) Ea 2.000 26 467 6359 Set (Ty Ii) (18 In) (Rcp) (4: 1) (P) Ea 4.000 27 467 6362 Set (Ty Ii) (18 In) (Rcp) (6: 1) (C) Ea 2.000 28 467 6363 Set (Ty Ii) (18 In) (Rcp) (6: 1) (P) Ea 58.000 29 467 6390 Set (Ty Ii) (24 In) (Rcp) (4: 1) (C) Ea 6.000 30 467 6394 Set (Ty Ii) (24 In) (Rcp) (6: 1) (C) Ea 6.000 31 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (P) Ea 4.000 32 467 6419 Set (Ty Ii) (30 In) (Rcp) (4: 1) (C) Ea 4.000 33 467 6463 Set (Ty Ii) (42 In) (Rcp) (4: 1) (C) Ea 4.000 34 480 6001 Clean Exist Culverts Ea 19.000 35 496 6007 Remov Str (Pipe) Lf 1,101.000 36 500 6001 Mobilization Ls 1.000 37 502 6001 Barricades, Signs And Traffic Handling Mo 11.000 38 506 6038 Temp Sedmt Cont Fence (Install) Lf 1,840.000 39 506 6039 Temp Sedmt Cont Fence (Remove) Lf 1,840.000 40 506 6042 Biodeg Erosn Cont Logs (Instl) (18") Lf 1,140.000 41 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 1,140.000 42 530 6004 Driveways (Conc) Sy 356.000 43 530 6005 Driveways (Acp) Sy 4,483.000 44 530 6008 Turnouts (Acp) Sy 22.200 45 533 6003 Rumble Strips (Shoulder) Asphalt Lf 100,519.000 46 533 6004 Rumble Strips (Centerline) Asphalt Lf 49,878.000 47 540 6001 Mtl W-Beam Gd Fen (Tim Post) Lf 1,075.000 48 540 6006 Mtl Beam Gd Fen Trans (Thrie-Beam) Ea 4.000 49 542 6001 Remove Metal Beam Guard Fence Lf 1,086.000 50 544 6001 Guardrail End Treatment (Install) Ea 8.000 51 544 6003 Guardrail End Treatment (Remove) Ea 6.000 52 560 6009 Mailbox Install-S (Rr-Post) Ty 4 Ea 12.000 53 560 6010 Mailbox Install-D (Rr-Post) Ty 4 Ea 1.000 54 560 6013 Mailbox Install-M (Tww-Post) Ty 4 Ea 1.000 55 644 6027 In Sm Rd Sn Sup&Am Tys80(1)Sa(P) Ea 52.000 56 644 6030 In Sm Rd Sn Sup&Am Tys80(1)Sa(T) Ea 13.000 57 644 6033 In Sm Rd Sn Sup&Am Tys80(1)Sa(U) Ea 6.000 58 644 6050 In Sm Rd Sn Sup&Am Tys80(2)Sa(P) Ea 1.000 59 644 6076 Remove Sm Rd Sn Sup&Am Ea 69.000 60 658 6013 Instl Del Assm (D-Sw)Sz (Brf)Ctb Ea 2.000 61 658 6015 Instl Del Assm (D-Sw)Sz (Brf)Gf1 Ea 13.000 62 658 6028 Instl Del Assm (D-Sy)Sz (Brf)Gf1 Ea 8.000 63 658 6046 Instl Om Assm (Om-2x)(Wc)Gnd Ea 10.000 64 658 6047 Instl Om Assm (Om-2y)(Wc)Gnd Ea 10.000 65 658 6061 Instl Del Assm (D-Sw)Sz 1(Brf)Gf2 Ea 10.000 66 658 6062 Instl Del Assm (D-Sw)Sz 1(Brf)Gf2(Bi) Ea 12.000 67 658 6068 Instl Del Assm (D-Dy)Sz 1(Brf)Gf2 Ea 8.000 68 658 6073 Instl Om Assm (Om-2y)(Wc)Gnd(Bi) Ea 35.000 69 658 6099 Instl Om Assm (Om-2z)(Wflx)Gnd Ea 10.000 70 658 6109 Instl Om Assm (Om-2z)(Wflx)Srf(Bi) Ea 40.000 71 662 6023 Wk Zn Pav Mrk Non-Remov (W)(Rr Xing) Ea 1.000 72 662 6034 Wk Zn Pav Mrk Non-Remov (Y)4"(Sld) Lf 101,984.000 73 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty Y-2 Ea 5,100.000 74 666 6035 Refl Pav Mrk Ty I (W)8"(Sld)(090mil) Lf 175.000 75 666 6299 Re Pm W/Ret Req Ty I (W)4"(Brk)(090mil) Lf 80.000 76 666 6302 Re Pm W/Ret Req Ty I (W)4"(Sld)(090mil) Lf 101,956.000 77 666 6311 Re Pm W/Ret Req Ty I (Y)4"(Brk)(090mil) Lf 11,630.000 78 666 6314 Re Pm W/Ret Req Ty I (Y)4"(Sld)(090mil) Lf 15,718.000 79 668 6076 Prefab Pav Mrk Ty C (W) (24") (Sld) Lf 80.000 80 668 6077 Prefab Pav Mrk Ty C (W) (Arrow) Ea 4.000 81 668 6085 Prefab Pav Mrk Ty C (W) (Word) Ea 3.000 82 672 6009 Refl Pav Mrkr Ty Ii-A-A Ea 974.000 83 672 6010 Refl Pav Mrkr Ty Ii-C-R Ea 18.000 84 752 6003 Tree Trimming / Brush Removal Mi 0.180 85 752 6015 Tree And Brush Removal Ac 0.420 86 760 6001 Ditch Cleaning And Reshaping (Foot) Lf 117.000 87 3076 6042 D-Gr Hma Ty-D Sac-B Pg70-22 Ton 19,910.000 88 3076 6066 Tack Coat Gal 14,263.000 89 6001 6001 Portable Changeable Message Sign Day 660.000 90 6185 6002 Tma (Stationary) Day 153.000 91 6185 6003 Tma (Mobile Operation) Hr 180.000 92

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents