Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

I-59 Widening
Infrastructure
Conception
Less than $50,000,000 est. value
Trussville, AL 35173

Southern Research Biotech Building
Demolition, New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Birmingham, AL 35203

The Tracks
New Construction, Infrastructure
Design
$41,000,000 est. value
Birmingham, AL 35233

Entrance Addition to Fairfield Board of Education
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Fairfield, AL 35064

Jefferson County Housing Authority (JCHA) Terrace Manor Roadway Improvement Project
Infrastructure
Bidding
$300,000 CJ est. value
Bessemer, AL 35022

Starbucks (Shell) / Trussville
New Construction, Infrastructure - 2,500 SF
Sub-Bidding
$650,000 CJ est. value
Trussville, AL 35173

Starbucks (Shell) / Trussville
New Construction, Infrastructure - 2,500 SF
Sub-Bidding
$650,000 CJ est. value
Trussville, AL 35173

BX Birmingham Xpress, Bus Rapid Transt (BRT) - Transit Stations
New Construction
Post-Bid
Birmingham, AL 35208

18Th Place South Improvements
Post-Bid
Homewood, AL

County Road 7 Roadway Failure Repair
Results
$559,865 est. value
Birmingham, Oneonta, AL 35244

7th Ave South - Streetscape Project
Results
$720,613 est. value
Birmingham, AL 35200

18th Street Townhouse Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Birmingham, AL 35209

Parkside Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Birmingham, AL 35233

Bell Hill Road Widening- County of Jefferson
Infrastructure
Conception
$6,000,000 to $8,000,000 est. value
Bessemer, AL 35021

Last Updated 08/05/2022 09:08 AM
Project Title

Turn Lane Extension on Valleydale Road at Jaguar Drive

Physical Address View project details and contacts
City, State (County) Hoover, AL 35242   (Shelby County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $302,208 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hoover hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises (DBEs) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, gender, religion, age, disability, marital status or national origin in consideration for an award.No Bids will be accepted or opened after the date and time set forth herein.An original Bid Bond in an amount of not less than five percent (5%) of the total amount Bid (not to exceed $10,000) must accompany each proposal. The payee of such bond shall be The City of Hoover, Alabama. The bid Bond shall bear the same date as set for the receipt of Bids. The Bid Bond shall be signed by an agent authorized to do business in the State of Alabama. The entire project shall be completed in 90 calendar days. Questions regarding this bid should be directed, no later than June 15, 2022 at 5:00 pm., to Doug Peterson, PE with Gonzalez-Strength & Associates, at (205) 942-2486 or by email at dpeterson@gonzalez-strength.com. Answers to questions, clarifications, corrections, and additions to the Bid Specifications will be issued in the form of Addendums to the Specifications which will not be distributed by delivery or mail but, rather, shall only be posted on the city's website by 5:00 pm June 22, 2022. It shall be the responsibility of the bidder to frequently visit the city's website to view or download such Addendums, if any are issued. The Contractor whose Bid is selected must furnish a Performance Bond for one hundred percent (100%) of the Bid amount, and a Payment Bond for fifty (50%) of the Bid amount and must secure the bond from a bonding company's representative agent authorized and licensed to do business in the State of Alabama. Each bond shall be countersigned by an agent of the Surety having residence in the State of Alabama, and who is authorized and licensed to do business in the State of Alabama and each bond shall depict the complete address of said agent. The City reserves the right to reject any or all Bids, to waive any formality in any Bid, and to accept any Bid considered advantageous to the City. The City reserves the right to hold the Bids for a period of ninety (90) calendar days after the date of receipt of Bids. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents