Similar Projects
Last Updated | 10/04/2021 12:45 PM |
Project Title | HS Building South Foundation Wall Repair and Site Drainage Improvement |
Physical Address | View project details and contacts |
City, State (County) | Green Bay, WI (Brown County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Finishes/Exterior, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work includes but not limited to: excavating soil at existing foundation wall in order to remove the existing waterproofing membrane on the foundation wall, removing the existing drain tile, installing new water proof membrane to foundation wall, installing new drainage board to foundation wall, installing new drain tile and connecting to existing sump pit, backfilling with stone, lowering the existing catch basin and re-grading the site to move water away from the building. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |