Similar Projects
Roofing Replacement for the Reading Public Library Northwest Branch Project
Renovation
Sub-Bidding
$100,000 CJ est. value
Reading, PA 19601

University Park (UP) - Annual Roof Replacement Program
Renovation
Sub-Bidding
$80,000 CJ est. value
State College, PA 16802

Districtwide Miscellaneous Roof Repair
Alteration
Post-Bid
Levittown, PA 19054

Airfield Vault Roof Replacement - General
Alteration
Post-Bid
PA

SCI Pine Grove - Re-Roofing Multiple Buildings
Results
Less than $3,500,000 est. value
Indiana, PA 15701

Hunt Armory Roof Stabilization
Results
Pittsburgh, PA 15206

FTF/Pump House 1 and 2 Roof Replacement Project - General
Alteration
Post-Bid
PA

Roof Replacements at North East Elementary Center
Alteration
Results
North East, PA 16428

Roof Replacement for the Punxsutawney Area Elementary School
Alteration
Post-Bid
Punxsutawney, PA 15767

Roof Replacements at Corry Middle High School
Alteration
Results
Corry, PA 16407

Roof Replacement
Alteration
Post-Bid
Harborcreek, PA 16421

Fire Station Roof Repair
Alteration
Results
$40,000 est. value
Mechanicsburg, PA 17055

Municipal Building Roof Replacement
Alteration
Post-Bid
$175,000 est. value
Carlisle, PA 17013

DLCC Design Build Roof Cable System Repairs
Alteration
Results
Pittsburgh, PA 15222

Replacement of the Existing Roofs
Alteration
Post-Bid
Waynesburg, PA

Last Updated 07/19/2023 12:46 PM
Project Title

Spray Foam for Containerized Kitchens

Physical Address View project details and contacts
City, State (County) Chambersburg, PA 17201   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This requirement is a new requirements contract for the acquisition of services for Spray Foam Insulation for Containerized Kitchens in support of the Force Provider Program at Letterkenny Army Depot (LEAD) in accordance with the Performance Work Statement (PWS) provided by the Technical Point of Contact (TPOC). The vendor will be required to come to LEAD to perform those services specified in the PWS. The anticipated Period of Performance is a 12- month Base Period and Two (2) one (1) year options. Estimate Quantities: Base Year, 36 assets total for the Base Year (3 per month), Option Year One: 36 assets total for Option Year One (3 per month), Option Year Two: 36 assets total for Option Year Two (3 per month). Total estimated quantity for the base year plus two (2) option years is 108.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents