Similar Projects
Pipestone Roof Repair on Visitor Center
Renovation - 1,440 SF
Sub-Bidding
$100,000 CJ est. value
Pipestone, MN 56164

Nicollet County Jail Re-Roofing
Renovation
Sub-Bidding
$420,000 CJ est. value
Saint Peter, MN 56082

Forest History Center Interpretive Center Roof Replacement
Alteration
Post-Bid
Grand Rapids, MN 55744

Minnesota Interagency Fire Center (MIFC) Roof Repair
Renovation, Alteration
Post-Bid
Grand Rapids, MN 55744

SCSU-20 Heat Plant Roof and Suppression System
Alteration
Results
Saint Cloud, MN 56301

Library and Recreation Center Reroof
Alteration
Results
Faribault, MN 55021

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Bid Package #1: Roofing
Renovation
Construction
$300,000 CJ est. value
Saint Paul, MN 55116

HRA Roof Replacement at Rivers Edge
Renovation
Construction
$174,630 CJ est. value
Rochester, MN 55901

Courthouse & LEC Roof Recoating
Renovation
Sub-Bidding
$115,000 CJ est. value
Montevideo, MN 56265

Monticello Library Roof
Alteration
Post-Bid
$50,000 est. value
Monticello, MN

Rochester Public Library Roof Replacement
Alteration
Results
Rochester, MN 55904

Roofing Consultant
Infrastructure
Post-Bid
Bloomington, MN

Forest View ES and FLAS Transportation Building Roof Replacements
Demolition, Alteration - 13,250 SF
Results
Forest Lake, MN 55025

Bemidji High School Reroof Project Phase - 1 and 2
Alteration
Post-Bid
Bemidji, MN 56601

Roof Replacement State Office Parking Ramp and Stair Towers
Alteration
Results
$470,000 est. value
Saint Paul, MN 55103

Last Updated 07/12/2023 09:34 PM
Project Title

Replace Roof at License Plate Building MCF St. Cloud

Physical Address View project details and contacts
City, State (County) Saint Cloud, MN 56304   (Sherburne County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $639,900 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: 2305 Minnesota Boulevard St. Cloud, MN 56304 The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Remove existing mezzanine hangers to relieve severely overstressed channels and beams. Install new columns and beams under mezzanine for support. Complete reroofing of Areas B1, B2, and B3; including structural, mechanical, and electrical modifications as indicated on the Drawings. This solicitation has been designated to be awarded to a State of Minnesota Targeted Group (TG), Economically Disadvantaged (ED), or Veteran-Owned Small Business. ONLY responses received from Contractors that are TG/ED/VO certified through the Department of Administration, Office of Equity in Procurement, will be considered. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor the work for at least 3 contracts which have achieved Substantial Completion since March 2018, for construction of similar scope of work. Each of these contracts MUST have had a construction value of $250,000 or greater. Project Manager and Job Superintendent listed each has had at least 3 contracts which have achieved Substantial Completion since March 2018, for construction of similar scope of work. Each of these contracts must have had a construction value of $250,000 or greater. All questions should be submitted no later than 2:00 PM, CDT, May 16, 2023. The State is not obligated to answer questions submitted after the question due date and time A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Remove existing mezzanine hangers to relieve severely overstressed channels and beams. Install new columns and beams under mezzanine for support 2. Complete reroofing of Areas B1, B2, and B3; including structural, mechanical, and electrical modifications as indicated on the Drawings Portions of the Building Included: 1. Remove existing mezzanine hangers to relieve severely overstressed channels and beams. Install new columns and beams under mezzanine for support. 2. Complete reroofing of Areas B1, B2, and B3; including structural, mechanical, and electrical modifications as indicated on the Drawings. 3. Background checks are required for all Contractor personnel prior to accessing the site, including pre-bid and pre-construction meetings. Refer to Construction Schedule and Site Access and Availability information herein for additional information. a. All contractor personnel are required to submit MN Department of Corrections Application for Access to MN Correctional Facilities/Sites (included at the end of this Section). The deadline for submitting these applications is 12:00 PM, March 28, 2023 for contractors attending the pre-bid meeting. Upon Contract award, all contractor employees intending to be on site during construction must submit completed applications. B. Existing Roof Construction: Refer to the Drawings 1. Refer to the Drawings for existing roof system information. 2. The existing roof system materials are based on information obtained at on site test cut locations. 3. No asbestos-containing roofing materials were discovered during destructive test cuts. 4. Refer to Section 01 70 00 for information regarding examination of the existing construction. C. Roofing - The work includes, but is not limited to the following: 1. Remove existing roofing materials down to the concrete deck. 2. Remove obsolete penetrations and cover openings as indicated on the Drawing 3. Replace existing roof-related wood blocking slated for reuse if it contains more than 19 percent moisture, shows evidence of rotting, or is otherwise in a condition that provides an unsuitable substrate to receive new materials. a. Include 1,000 board feet of wood blocking replacement in the Base Bid. 4. Prime the concrete deck. 5. Install new isocyanurate insulation layers and high-density cover board in low rise foam adhesive as detailed on the Drawings. 6. Install a fully-adhered 90-mil EPDM membrane and flashings. Provide a 30-year NDL full system warranty. 7. Install new roof drains, scuppers, overflow scuppers, downspouts, splashblocks, splash pans, and access ladder posts as shown on the Drawings. 8. Install color-coated galvanized steel flashings at the details. D. Mezzanine: 1. Remove hanger rods from the underside of the deck to the mezzanine. 2. Install new structural columns below the mezzanine, relocate and modify one interior window, and trim and repair partition wall with new gypsum board sheathing. 3. Relocate electrical wiring/conduit as required to install new structural columns. 4. Patch and paint all disturbed surfaces from demolition to match adjacent surfaces. Install gypsum board wrap and paint at new columns. E. Install 3/8" cement board over the interior brick parapet walls, followed by two layers of 3/4" plywood and flush seam metal panels. F. Construct new steel stud parapet with plywood and spray foam insulation. G. Clean and tuck point granite cap stones with new sealant, backer rod, and mortar.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents