Similar Projects
Laurentide Glen
New Construction
Conception
Bristol, CT

Fiddlehead Place
New Construction
Conception
$92,000 est. value
Suffield, CT

West Street Hotel
New Construction, Infrastructure - 22,620 SF
Design
$6,800,000 CJ est. value
Southington, CT 06479

Chestnut Ridge
New Construction
Design
South Windsor, CT

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Bidding
$4,000,000 CJ est. value
Hartford, CT 06103

Bloomfield Center Fire District, Co. 3
Demolition, New Construction, Infrastructure
Bidding
$9,000,000 CJ est. value
Bloomfield, CT 06002

The Spark - 690 Cedar Street Apartments
New Construction, Infrastructure - 364,669 SF
Post-Bid
$55,000,000 CJ est. value
Newington, CT 06111

TOD Responsible Growth Grant Phase 2 - House Relocation
Renovation
Post-Bid
Windsor Locks, CT 06096

Single Family Home Rehabilitation Project
Renovation
Results
$25,000 est. value
Windsor, CT 06095

Single Family Rehabilitation
Renovation
Results
Plainville, CT 06062

Reservoir Estates
New Construction - 54,000 SF
Construction
Wethersfield, CT 06109

The Hamlet at King's Meadow
New Construction
Construction
Suffield, CT 06078

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

Loukopoulos Building E
New Construction, Infrastructure - 12,600 SF
Pending Verification
$2,500,000 CJ est. value
Southington, CT 06489

Meadow View Farm
New Construction
Conception
Bristol, CT

Last Updated 04/04/2023 02:09 PM
Project Title

Veterans Terrace Phase 3

Physical Address View project details and contacts
City, State (County) East Hartford, CT 06118   (Hartford County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $21,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work: Abatement of ACM & PCB’s and complete demolition of (7) existing residential structures (2 – 4 unit, 1 – 6, 2 – 8 unit, 2 – 12), full site & utility demo, install new UG utilities including storm & sewer, domestic & fire water, electrical & gas, street/parking, new construction of (9) residential slab on grade wood structures (51 total units), engineered open web floor joist and roof trusses, new SOG community/laundry center with solar panels & generator, playground, basketball court, site security system, fencing & landscaping. All buildings to be modern, energy-efficient, wood-framed, construction assemblies. Project complies with ADA & accessibility requirements of the CT Building Code, a fully addressable fire alarm/call for aid system, a code compliant residential fire-suppression system and camera security system. All trades are required. Bonds are not required. General building permit only, by GC. All MEP proposals must include cost for their respective permits. The contract subject to state set-aside and contract compliance requirements, nondiscrimination statutes & set-aside requirements. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract to be set aside for subcontractors holding current certification from the Connecticut Department of Administration Services. The contractor must demonstrate good faith effort to meet the 25% set-aside goals. Certified state, local SBE/MBE/WBE, Section 3 companies are highly encouraged to submit. Davis-Bacon residential wage rates apply. Certified payrolls and Monthly employee utilization reporting also required.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents