Similar Projects
Homewood Public Library Parking Lot Paving
Infrastructure
Bidding
Homewood, AL 35209

Constructing the Additional Lanes (Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe)
Infrastructure
Bidding
$5,323,785 to $6,506,848 est. value
AL

Gardendale City Street Project
Post-Bid
Gardendale, AL 35071

Standard Patch Paving/Longitudinal Transverse/ Mill and Resurfacing
Post-Bid
Birmingham, AL 35222

Southern Region Disaster Recovery Support BPA
Results

Construction of A New Road Known as "City Street"
Results
Gardendale, AL 35071

Annual Asphalt and Roadway Repair
Post-Bid
Less than $100,000 est. value
Adamsville, AL

Constructing the Planing, Resurfacing, and Traffic Stripe
Results
$1,757,279 to $2,147,786 est. value
AL

18Th Place South Improvements
Post-Bid
Homewood, AL

Constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-3 (US-31)
Results
$2,050,935 to $2,506,698 est. value
AL

Jeff Met West Industrial Park Access Road (Cross Drive)
Infrastructure
Post-Bid
Birmingham, AL

Crosshaven Drive Widening
Results
$3,015,563 est. value
Vestavia Hills, AL 35216

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

UAB - Hansell/Hulsey Center Sculpture Yard Paving
Results
$50,000 to $55,000 est. value
Birmingham, AL 35294

Constructing the Pavement Rehabilitation (Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe)
Results
$7,594,529 to $9,282,203 est. value
AL

Last Updated 07/22/2021 05:24 PM
Project Title

Powder Plant Lane Roadway Improvements

Physical Address View project details and contacts
City, State (County) Bessemer, AL 35022   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: The Powder Plant Lane Improvements Project consists of rehabilitation and resurfacing of approximately 2,500 square yards of an existing 24' wide roadway. Items to be installed include 220 tons of asphalt wearing surface, 365 tons of asphalt upper binder layer, 300 tons of asphalt lower binder layer and 40 linear feet of concrete curb and gutter replacement. Unclassified excavation and roadbed processing will be required earthwork items on this project. The project also includes various miscellaneous items such as traffic control, erosion control, and loop wire.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents