Similar Projects
Chiller Replacement
Post-Bid
Youngwood, PA 15697

Penn Trafford High School - Mechanical Pipe Remediation
Post-Bid
Harrison City, PA 15636

Westmoreland Manor Hot Water Pumps
Results
Greensburg, PA 15601

EOC Training Room Renovation Mechanical Construction - Bid Package 2
Renovation
Results
Less than $14,500 est. value
Greensburg, PA 15601

Greensburg Public Works Department Maintenance Building - HVAC
Post-Bid
Greensburg, PA 15601

CHP Project, Contract 02
Results
$615,000 est. value
Herminie, PA 16148

HVAC and Mechanical Products
Term Contract
Post-Bid

UFAS Accessibility Renovation Project - Mechanical
Results
New Kensington, PA 15068

Water Treatment Improvements - General/Mechanical Construction
Post-Bid
Derry, PA

PA State Police Greensburg - DNA Laboratory Facility New Building - HVAC Construction
Results
$3,000,000 to $4,000,000 est. value
Greensburg, PA 15601

Derry Borough Wastewater Treatment Plant Sludge Press Building General/Mechanical Construction
Post-Bid
Derry, PA

Additions and Alterations to the Allegheny Township Municipal Building - HVAC Construction
Results
Less than $119,810 est. value
Leechburg, PA 15656

Westmoreland Manor Louver Hood Installation
Post-Bid
Greensburg, PA 15606

Heat Pump Motor Replacement for the Courthouse Extension Building
Results
Greensburg, PA 15601

Business & Industry Chiller Replacement
Post-Bid
Youngwood, PA 15697

Reported 09/09/2020 12:00 AM
Project Title

Designing a New HVAC System to Replace the Existing Boiler and Air Handling System

Physical Address View project details and contacts
City, State (County) North Huntingdon, PA 15642   (Westmoreland County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project that will consist of designing a new HVAC system to replace the existing boiler and air handling system, the design of all related electrical work required to power the new system(s), structural analysis and design to mount new condensing units on the roof and architectural specifications that may be required for installation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents