Similar Projects
Earlington Heights Metrorail Station Mixed Use
New Construction - 15,000 SF
Conception
Miami, FL 33142

Parks and Recreation Department New Tampa Community Park Inclusive Playground Design-Build
Conception
Less than $1,600,000 est. value
Tampa, FL

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
Palm City, FL 34990

Alexan Crafts
New Construction - 306,936 SF
Design
$10,000,000 CJ est. value
Coral Gables, FL 33134

Design - Build Services for Small Active and Passive Parks Design-Build Projects
New Construction, Renovation
Bidding
Jacksonville, FL

Construction of the Lake Myrtle Park Competitive Ski Lake
New Construction
Bidding
Auburndale, FL 33823

Pine Island Park Reconstruction
Post-Bid
Less than $7,416,001 est. value
Plantation, FL 33324

Basketball and Tennis Court Resurfacing
Post-Bid
Palm Beach Gardens, FL 33410

Athletic Track and Tennis Court Resurfacing and Repair
Term Contract
Results
Jacksonville, FL 32207

Julius Guinyard and Adjacent Park Improvement Project
Results
Less than $188,699 est. value
Jacksonville, FL 32202

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

Five Park
New Construction
Construction
$345,000,000 est. value
Miami Beach, FL 33139

Lake Sana Development
New Construction
Conception
Miami, FL 33010

Jupiter School Daycare
Renovation - 13,891 SF
Design
Orlando, FL 32819

CDBG – Fleming Playground
New Construction
Bidding
Ormond Beach, FL 32174

Last Updated 06/14/2021 08:52 AM
Project Title

Rowell's Waterfront Park Phase I

Physical Address View project details and contacts
City, State (County) Key Largo, FL 33037   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, supervision, materials, power, tools, equipment, supplies, permits and any other means of construction necessary or proper for performing and completing the Scope of Work, unless otherwise specifically stated. This project includes clearing and grubbing; removal of existing asphalt and fencing; construction of asphalt driveway, parking spaces, pedestrian sidewalk and crosswalk, restroom facility with associated utilities, and a pedestrian pathway that runs from a 30' x 30' concrete pad near Blackwater Sound and connects with the existing trail on the north side of U.S. 1; signing and pavement markings; installation of fencing, bike rack, and parking lot lighting; landscaping, including planting and some tree removals.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents