Similar Projects
Resufacing
Alteration
Design
$18,000,000 est. value
Hugo, MN

Coon Rapids Boulevard Apartment
New Construction, Infrastructure
Design
$16,000,000 CJ est. value
Coon Rapids, MN 55433

Sunrise Elementary School Additions and Alterations
Addition, Demolition, Renovation, Infrastructure - 11,400 SF
Bidding
$2,000,000 CJ est. value
Blaine, MN 55449

7th Street and 57th Avenue Trail Project
Infrastructure
Bidding
$500,000 CJ est. value
Fridley, MN 55432

Anoka County 911 Center and Radio Shop
New Construction, Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Andover, MN 55304

Hardwood Creek Trail Feasibility Study
Addition
Post-Bid
Hugo, MN

CSAH 18 Bailey Road Landscape
Post-Bid
Woodbury, MN 55125

2021 Street Rehabilitation
Results
$2,490,000 est. value
Columbia Heights, MN

2021 Street Rehabilitation
Results
$2,490,000 est. value
Columbia Heights, MN

AHSD River Trail Learning Center 2023 Addition
Addition, Demolition, Infrastructure
Bidding
$1,000,000 CJ est. value
Minneapolis, MN 55433

Gordon Bailey ES Pavement Rehabilitation
Post-Bid
Woodbury, MN 55129

CSAH 19 (Woodbury Drive) Mobility and Safety Improvement
Results
Woodbury, MN 55125

North Smoky Hills Graveling
Renovation
Post-Bid

2021 Street Pavement Maintenance
Results
$2,200,000 est. value
Forest Lake, MN

2021 Concrete Paving Rehabilitation
Post-Bid
Minneapolis, MN

Last Updated 08/12/2022 05:01 AM
Project Title

2022 Thin Bituminous Overlay/City Hall Parking Lot Improvements Project

Physical Address View project details and contacts
City, State (County) Centerville, MN 55038   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

neighborhood. Also included is the replacement of bituminous pavement at the City Hall parking lot. The Project consists of the following approximate quantities: 40,000 SQ YD Bituminous Milling (1") 110 EACH Structure Adjustment 1,400 LIN FT Remove and Replace Concrete Curb and Gutter 400 CY Select Granular Borrow 550 TON Class 5 Aggregate Base 3,000 TON Bituminous Paving Materials 450 CY Common Excavation 1,100 LF Parking lot striping 500 SQ YD Restoration Along with miscellaneous utility improvements, removals, erosion control, restoration, and correlated appurtenances. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. Mark Stats Administrator City of Centerville, Minnesota.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents