Similar Projects
Multidisciplinary Research/Informatics Science Building IV - IU School of Medicine
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Bloomington, IN 47405

Multidisciplinary Research/Informatics Science Building IV - IU School of Medicine
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Bloomington, IN 47405

3000 and 3070 S Walnut St Warehouse / Bloomington
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Bloomington, IN 47401

3000 and 3070 S Walnut St Warehouse / Bloomington
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Bloomington, IN 47401

Asphalt Resurface
Infrastructure
Bidding
$3,650,000 CJ est. value
Bloomington, IN 47401

Asphalt Resurface
Infrastructure
Bidding
$3,650,000 CJ est. value
Bloomington, IN 47401

Wright Quad Renovation - Indiana University - Bloomington Campus - Bid Package #1
Renovation, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Bloomington, IN 47406

Baby Creek Road Small Structure Replacement
Infrastructure
Post-Bid
Bloomington, IN 47408

Bike and Pedestrian Facilities
Results
Bloomington, IN

BL000A Site Dunn Street Pedestrian Connection
Infrastructure
Results
Bloomington, IN 47404

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

The Retreat at Swithchyard Park
New Construction, Infrastructure - 3,000 SF
Construction
$24,000,000 CJ est. value
Bloomington, IN 47401

2nd Street Commercial Addition
Addition, Demolition, Infrastructure, Renovation - 17,690 SF
Pending Verification
$3,500,000 CJ est. value
Bloomington, IN 47401

2nd Street Commercial Addition
Addition, Demolition, Infrastructure, Renovation - 17,690 SF
Pending Verification
$3,500,000 CJ est. value
Bloomington, IN 47401

Monroe Convention Center Expansion
Addition, Demolition, Renovation, Infrastructure - 60,000 SF
Design
$44,000,000 CJ est. value
Bloomington, IN 47403

Last Updated 04/25/2023 05:09 PM
Project Title

Griffy Lake Dam Trail Crossing Constructions

Physical Address View project details and contacts
City, State (County) Bloomington, IN 47408   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $334,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Location: Approximately 400' south of the Griffy Creek stream crossing at Bloomington Griffy Lake Dam Trail Crossing Constructions This project titled 'Griffy Lake Dam Trail Crossing' shall include, but is not limited to improvements including site preparation, excavation, earthwork, fill, approximately 850 feet of trail construction, demolition, construction of fencing, and the construction of an approximately 200-foot long staircase at the site of the Griffy Lake Dam on N Dunn St. in Bloomington, IN. A trail will be constructed along the crest of Griffy Lake Dam (State ID 53-3)with connectivity to the parking lot at the downstream toe of the dam. The segment of trail along the dam crest will complete a loop around the lake with connectivity to existing trails along the north and south shores of the lake. The scope of work includes constructing an 860' long. 12" wide gravel (base bid) or concrete (alternate bid) trail along the dam crest with the area of trail construction excavated and backfilled to maintain the existing dam crest elevation of 642.5'. NAVD 1088. The project also includes installing cedar spilt rail and chain link fence along the crest to keep trail users off the dam and installing signage to direct trail users to stay off the dam. At the west end of the dam a 170" long. 6' wide, elevated wooden staircase will be constructed on the downstream slope of the dam to carry the trail from the dam crest to the base of the dam and an existing gravel parking lot. Riprap will be placed over a geotextile fabric beneath and adjacent to the stairs.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents