Similar Projects
Citico Pump Station Improvements
Renovation
Bidding
$600,000 est. value
Chattanooga, TN 37403

Pump Station Improvements
Renovation
Bidding
$500,000 est. value
Chattanooga, TN

Sewer System Improvements Express Mart Pump Station Replacement
Post-Bid
TN 37847

Contract 121- Hayshed Road and Luke Lane Sewer Improvements
Post-Bid
Charlotte, TN 37036

Sewer System Improvements - Sewage Pumping Station Replacement at WWTP
Results
Pulaski, TN

2018-19 Lift Station Phase-Out
Renovation
Results
Johnson City, TN

Potter Place Road NW Water Booster Pump Station
Renovation
Bidding
$500,000 est. value
Cleveland, TN 37310

Influent Screening Improvements
New Construction
Post-Bid
Mount Pleasant, TN

2020 ARC Project for Clayton Homes Pump Station and Force Main Conveyance
New Construction
Results
Rutledge, TN

Construction of the Edmondson Lane Booster Pump Station
New Construction
Bidding
$400,000 est. value
Knoxville, TN 37918

Sewer Pump Station Wetwell Cleaning
New Construction
Post-Bid
Murfreesboro, TN

Gardens Lift Station Upgrade
Renovation
Results
Crossville, TN

Dry Creek Area Pump Station, Force Main, and Gravity Pipe Improvements
Renovation, Infrastructure
Bidding
$300,000 est. value
Nashville, TN

Pump Station No. 30
New Construction
Post-Bid
$200,000 est. value
Clinton, TN

WWTP Water Pump Station Enclosure
Results
Clarksville, TN

Reported 06/15/2022 12:00 AM
Project Title

Timber Trail Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) TN   (Wilson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $535,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing and installation of a suction lift pump station including pumps, fiberglass shelter, stainless steel base, HDPE suction and discharge piping, together with all required instrumentation, equipment, plumbing, heating, ventilation, electrical, site work, and appurtenances as required. The project will include the following described construction: Furnishing and installation of a suction lift pump station including pumps, fiberglass shelter, stainless steel base, HDPE suction and discharge piping, together with all required instrumentation, equipment, plumbing, heating, ventilation, electrical, site work, and appurtenances as required.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents