Similar Projects
Northwestern Elementary - Systemic Renovation - Plumbing - 8.13.556 - Wicomico County Public Schools
Alteration
Conception
$796,000 est. value
Mardela Springs, MD

Wicomico Middle Systemic Renovation - Plumbing - 45.06.460 - Wicomico County Public Schools - 5760351
Infrastructure
Conception
$2,250,000 est. value
Salisbury, MD 21804

The Town of Queenstown - Water Tower, Water Treatment, Well and Water Main Project
New Construction, Infrastructure
Design
$7,300,000 CJ est. value
Queenstown, MD 21658

FY23 Sanitary Sewer Main CIPP Lining
Infrastructure
Bidding
$390,634 CJ est. value
Easton, MD 21601

Plumbing Repair Services at BWI Thurgood Marshall and Martin State Airports
Term Contract
Sub-Bidding
Middle River, MD 21220

Plumbing Services for MDOT/SHA Locations in Dorchester County
Term Contract
Sub-Bidding
Cambridge, MD 21613

Plumbing Services
Term Contract
Post-Bid
Berlin, Salisbury, MD

Plumbing Services
Term Contract
Post-Bid
Berlin, Salisbury, MD

Senior Center Activity Building Plumbing Renovation
Alteration
Results
Hagerstown, MD

Install Water Saving Devices in Select Housing Units at Maryland Department Of Correction - Eastern Correctional Institution
Infrastructure, Alteration
Results
$100,000 to $500,000 est. value
Westover, MD 21890

Wicomico High School - Systemic Renovation - Plumbing - 46.13.547 - Wicomico County Public Schools
Alteration
Conception
$550,000 est. value
Salisbury, MD 21804

Boiler Room Pressure Reducing Station and Pipe Replacement Parkville Readiness Center
Renovation
Sub-Bidding
$80,000 CJ est. value
Nottingham, MD 21236

On-Call Plumbing Services
Alteration
Post-Bid
Bowie, MD

Egg Shaped Digester Rehabilitation Improvements at the Back River Wastewater Treatment Plant
Infrastructure
Results
$88,520,000 CJ est. value
Baltimore, MD 21224

On-Call Plumbing Services at MDOT SHA Locations in Saint Mary County - Rebid
Term Contract
Post-Bid
Leonardtown, MD 20650

Last Updated 09/06/2023 09:36 AM
Project Title

Upgrade all faucets and flush valves to hands-free

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21202   (Baltimore City County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. General Scope of Work a) The Hilton Heights Community Center is made up of two adjacent buildings located at 500 North Hilton Street and 530 North Hilton Street, Baltimore, Maryland 21229. The successful contractor shall provide all labor, equipment, tools, materials and supplies required to remove and replace all restroom and breakroom faucets to touchless operation. In addition, remove and replace the flush lever on all restroom urinal and nonpressure assist toilet flush valves and change to touchless operation, at the Hilton Heights Community Center in accordance with terms, conditions and specifications of the project manual and contract documents. 2) Scope of Work: a) The work to be accomplished under this contract is located at the Hilton Heights Community Center, 500 & 530 N. Hilton Street, Baltimore, Maryland 21229 and consists of furnishing all labor, material, equipment and services necessary and incidental to the completion of work as described herein. i) Remove a total of fifteen (15) faucets and related hardware, as needed to facilitate work, located male and female restrooms, and replace them with fifteen (15) new touchless faucets with vandal proof aerators per material list and specifications. ii) Remove a total of two (2) kitchen faucets and related hardware as needed to facilitate work, located in breakrooms, and replace them with two (2) new touchless faucets with vandal proof aerators per material list and specifications. iii) Remove a total of ten (10) handles on manual tankless toilet flush valves in the men's and women's restrooms located at 500 N. Hilton (only) and replace them with Sloan "Sensor Flushometer," for touchless flush operation, per material list and specifications. iv) Remove a total of three (3) handles on manual Urinal flush valves in the men's restrooms, and replace them with Sloan "Sensor Flushometer," for touchless flush operation per material list and specifications. b) Location of work areas are labeled below in the section titled Material Quantity and Location List, but contractor must coordinate with the DGS Maintenance Supervisor or Project Manager for access. c) The water fixture flush valves, faucets & associated components shall be connected into the existing supply piping systems and fixtures. Any modifications required to permit the installation of the equipment specified herein shall be the responsibility of the Contractor and will be included in the Base Bid d) Contractor to install materials per manufacturer's directions and specifications. e) Any and all work performed, all products and materials installed shall be in accordance with the standards established by all local, state and federal agencies, i.e.: i) Occupational Health and Safety (OSHA) ii) Maryland Occupational Safety and Health (MOSH) iii) Basic National Building Code (BOCA) iv) International Plumbing Code (ICC) v) American National Standards Institute (ANSI) f) The contractor will be responsible to obtain and pay for all inspections and any permits necessary for the entire project. g) The Contractor shall sanitize waterlines in accordance with State Health Dept. requirements and other agencies. h) The Contractor will relocate and /or reconfigure any items as necessary, such as, but not limited to piping, valves, conduit or any other obstacles to the installation of the new flush valves and faucets. i) The Contractor shall isolate the main water pipe going to the area to be repaired by locating and shutting off the valve upstream on the main branch that controls the specific area to facilitate the work. j) The Contractor shall cut/remove a piece of piping (if needed) that may interfere with the replacement of the valves and faucets to facilitate the work. k) The Contractor shall re-establish water service to affected areas and verify system working properly and free of any leaks. l) The Contractor shall inspect the work with the DGS Maintenance Supervisor and Project Manager. Also provide a Demonstration and Training to the maintenance staff. m) Pro-Press union/fittings are not allowed for this project. n) The contractor shall repair and restore to its original condition any equipment, materials,or surfaces damaged as a result of their operations during this contract at their own expense. The project consists of furnishing all labor, material, equipment and services necessary and incidental to the completion of work as described herein. Remove a total of fifteen (15) faucets and related hardware, as needed to facilitate work. Remove a total of two (2) kitchen faucets and related hardware as needed to facilitate work. Remove a total of ten (10) handles on manual tankless toilet flush valves. Remove a total of three (3) handles on manual Urinal flush valves. This project is located at 500 and 530 N. Hilton Street, Baltimore, MD 21229. Please see Project Manual for all details. The deadline for questions has been established as _8/29/2023___ at __1PM__, to assure that there is enough time to allow the A/E to provide responses and Addendum issuance if necessary. Please submit all questions to the Procurement Officer: James Alston - james.alston1@maryland.gov and Supervisor Christine Stenhouse - christine.stenhouse1@maryland.gov

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents