Similar Projects
Redevelopment Construction Of A Climate Controlled Self-Storage Facility
New Construction - 43,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Brookfield, WI 53005

John and Lavinia Rockwell Park Construction - Phase 1
Infrastructure
Bidding
$465,000 est. value
Oconomowoc, WI 53066

Creekwood Apartments
New Construction
Sub-Bidding
Menomonee Falls, WI 53052

Silver Lake Auto
Addition - 3,755 SF
Sub-Bidding
Oconomowoc, WI 53066

Pre-Engineered Metal Buildings
New Construction
Post-Bid
New Berlin, WI 53151

2021 Road and Parking Lot Crack Fill and Striping
Infrastructure
Post-Bid
WI

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

DPW Garage Workshop Addition
Addition - 522 SF
Results
$100,000 est. value
Merton, WI

The Village At Fox River
New Construction
Construction
Waukesha, WI

Waukesha Iron & Metal
Addition - 6,300 SF
Construction
Waukesha, WI 53186

Sikich LLP Offices
Build-Out - 18,000 SF
Pending Verification
Brookfield, WI 53045

Veit & Co Inc. New Regional Office
New Construction - 35,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
New Berlin, WI 53146

Northview Road Sidewalk
Infrastructure
Post-Bid
$65,000 est. value
Pewaukee, WI 53072

2021 Road Program
Results
Sussex, WI

Hendricks Delafield Development
New Construction
Construction
Delafield, WI 53018

Reported 05/14/2022 02:58 AM
Project Title

Construct Wildlife Shop Facility

Physical Address View project details and contacts
City, State (County) Waukesha, WI   (Waukesha County)
Category(s) Commercial, Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Office, Sidewalks/Parking Lot, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $1,970,900 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Build a heated shop, storage, CWD lab and field office facility. This facility would contain an open office for six staff members. Heated storage for equipment and vehicles. Heated shop space. Bathroom facilities and a utility room. A CWD lab area. Site work to include parking for six vehicles, one ADA space and space for two visitors plus additional gravel lot area. On March 31, 2022, the project was approved through design by the State of Wisconsin. A design team has not been selected.

Details

Office, New Construction, Laboratory, New Construction, Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents