Similar Projects
Baldwin County Resurfacing Projects 2022: Group #2
Infrastructure
Bidding
Dothan, Fairhope, Foley, Robertsdale, Summerdale, AL 36574

Resurfacing and Traffic Stripe on Ashford Road, on Roney Road, on Cowarts Creek/South Broad Street, on Bethel Road, on Hosea Road
Infrastructure
Bidding
$1,698,471 to $2,075,909 est. value
Ashford, AL

Constructing the Resurfacing on Hodgesville Road From the Junction of East Saunders Road
Post-Bid
$513,012 to $627,244 est. value
AL

Addition of Bike/Pedestrian Facility to Houston Street
Infrastructure
Post-Bid
$150,000 to $175,000 est. value
Cottonwood, AL 36320

Southern Region Disaster Recovery Support BPA
Results

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Bituminous Surface Treatments
Infrastructure
Post-Bid
Dothan, AL

Constructing the Planing, Resurfacing, and Traffic Stripe
Results
$2,214,676 to $2,706,826 est. value
Dothan, AL

Constructing the Additional Lanes (Grading, Drainage, Pavement, Traffic Signals, Traffic Signs, Retaining Walls, And Traffic Stripe) on SR-210 (Ross Clark Circle) from South of the Junction of Meadowbrook Drive South to North of the Junction of North Cherokee Avenue
Infrastructure
Post-Bid
$28,663,083 to $35,032,657 est. value
AL

Walton Park Trail Paving
Results
Less than $201,670 est. value
Dothan, AL

Constructing the Additional Turn Lanes (Grading, Drainage, Pavement, Traffic Signs, Traffic Signals, and Traffic Stripe)
Results
$3,930,738 to $4,804,235 est. value
Dothan, AL 36301

2021 City Street Resurfacing Project
Infrastructure
Results
Dothan, AL

Constructing the Planing, Resurfacing, and Traffic Stripe on CR-112
Infrastructure
Results
$496,450 to $606,772 est. value
AL

Constructing the Resurfacing on CR-41 (Walden Drive) from the Junction of Kinsey Road to the Junction of Broad Street in Kinsey (Site 1)
Infrastructure
Results
Dothan, AL 36303

Constructing the Left Turn Lane Addition and Intersection Modifications
Infrastructure
Results
$286,415 to $350,062 est. value
Dothan, AL

Reported 04/20/2022 12:00 AM
Project Title

2021 CDBG Moss Street Paving Project

Physical Address View project details and contacts
City, State (County) Dothan, AL 36301   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pave the asphalt along Moss Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents