Similar Projects
PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
$5,368,000 CJ est. value
Gurnee, IL 60031

Storm - Clavey - US 41 to Green Bay - City of Highland Park
Infrastructure
Conception
$2,303,000 CJ est. value
Highland Park, IL 60035

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Drainage Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Waukegan, IL 60085

Parking Lot Replacement
Renovation
Post-Bid
Antioch, Grayslake, Gurnee, Round Lake Beach, Wauconda, Zion, IL 60030

Pavement Reconstruction, Resurfacing, Curb and Gutter
Infrastructure
Results
Highland, IL

Pavement Reconstruction, Curb and Gutter, Sidewalk Replacement, Storm Sewer, Drainage Structures and Pavment Marking on Brandywyn Lane from Deerfield Pkwy to Thompson Boulevard
Infrastructure
Results
Buffalo Grove, IL

The Clove
New Construction, Infrastructure - 113,000 SF
Construction
$150,000,000 CJ est. value
Buffalo Grove, IL 60089

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

U-Haul / Mundelein
New Construction, Infrastructure - 33,800 SF
Pending Verification
$3,500,000 CJ est. value
Mundelein, IL 60060

Streets - Clavey - US 41 to Green Bay - City of Highland Park
Infrastructure
Conception
$1,620 CJ est. value
Highland Park, IL 60035

Grand Avenue Car Wash Redevelopment
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000 CJ est. value
Gurnee, IL 60031

Elgin O'hare Western Access Tollway (I-490) Railroad Bridge Construction, Union Pacific Railroad Over Grand Avenue East of Tri-State Tollway (I-294)
New Construction, Infrastructure
Post-Bid
$20,812,779 CJ est. value
Gurnee, IL 60031

Holiday Hills/ Le Villa Vaupell Sewer Extension - Phase 1
Infrastructure
Results
$6,227,127 CJ est. value
Island Lake, IL 60042

Last Updated 07/24/2023 01:14 PM
Project Title

Removal and Construction of Bridge Deck

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $3,650,806 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(2,344-Ft) Removal and construction of bridge deck, approach slab and pavement connector for bridge carrying over UPRR and bridge deck scarification and overlay for the bridge carrying over US 41 in the City of Park City and Village of Gurnee, Lake County. Region 1 District 1 Federal Project # N/A County(s) Lake Key Route(s) FAP 346 FAU 1223 Marked Route(s) US 41, Washington St Section(s) 2021-077-B-R&FL State Job #(s) C-91-216-21 PPS #(s) 1-78405-0000 1-78405-1000 Completion Date: August 26, 2023 Plus 5 Working Days Questions not accepted as of June 07, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 005 - Removal and Construction of Bridge Deck

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents