Similar Projects
Michelson Water Recycling Plant Tertiary Filter Improvements
Renovation, Infrastructure
Bidding
$17,899,000 CJ est. value
Irvine, CA 92612

Plumbing Supplies
Term Contract
Sub-Bidding
Long Beach, CA 90810

On-Call Plumbing Services
Term Contract
Sub-Bidding
Manhattan Beach, CA 90266

Airport Plumbing Repairs and Inspections as Requested
Alteration
Post-Bid
Livermore, CA 94551

On-Site Non-Potable Water Reuse Strategy
Alteration
Post-Bid
$250,000 est. value
Sacramento, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

Bakersfield High School Warren Hall Modernization Descope Phase 1: Plumbing
Renovation, Infrastructure
Sub-Bidding
$293,150 CJ est. value
Bakersfield, CA 93304

As Needed Plumbing Maintenance and Repair for Met In-Town Housing (Multiple Locations)
Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

Glen Avon Elementary School Sitework
Renovation, Infrastructure, Alteration
Results
$1,300,000 est. value
Riverside, CA 92509

Install Cured-in-place Pipeliners
Infrastructure
Sub-Bidding
$310,000 CJ est. value
Riverton, CA 95726

As Needed Plumbing Maintenance and Repair for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Desert Center, Los Angeles, CA 90012

As Needed Plumbing Services
Term Contract
Results
Oakland, CA

On-Call Plumbing Services
Term Contract
Sub-Bidding
Claremont, CA 91711

As Needed Plumbing Maintenance and Repair for Metropolitan`s Hinds Pumping Pump Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

Last Updated 04/14/2023 06:34 PM
Project Title

PW Various Locations Pavement Renovation No. 60 and Sewer Replacement

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94103   (San Francisco County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,663,096 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is at various locations throughout San Francisco, California and consists of pavement renovation, curb ramp and bus pad installation, sewer replacement, electrical work, traffic control, and all related work. Contract duration: 693 consecutive calendar days from NTP to Substantial Completion. LBE Subcontracting Participation Requirement is 20% LBE. Pursuant to Sec. 14B.9 of the Administrative Code, bidders are hereby advised that the availability of Minority Business Enterprises (MBE), Woman Business Enterprises (WBE) and Other Business Enterprises (OBE) to perform subcontract work on this project is as follows: 11% MBE; 2% WBE; 10% OBE. Class A license required to bid. For information on the Citys Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com. This Project shall incorporate the required partnering elements for Partnering Level 2.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents