Similar Projects
2022 HVAC Improvement Projects
Alteration
Bidding
$900,000 est. value
Le Roy, MI

Ventilation and Electrical Equipment, Roofing
Alteration
Bidding
Yale, MI

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

2021 Air Conditioning and Lighting Upgrades- BP 4
Post-Bid
Ann Arbor, MI 48104

HVAC Services
Results
Howell, MI

Cooling Upgrades for Herbison Woods School
Results
Dewitt, MI 48820

Hillsdale Community Schools 2023 HVAC Upgrades
Term Contract
Bidding
$400,000 est. value
Hillsdale, MI

HVAC Systems at its Downtown Transfer Center
Post-Bid
Jackson, MI

Library and Senior Center Rooftop HVAC Unit Replacement
Results
Wyoming, MI 49509

Henry Ford Dust Collection
Post-Bid
Detroit, MI 48219

HVAC and Ceiling Modifications - Grand Haven Township Offices
Results
Grand Haven, MI

HVAC and Mechanical Products
Term Contract
Post-Bid

Plumbing/HVAC Services
Results
Benzonia, MI

Elementary School Air Conditioning & Lighting Upgrades
Post-Bid
Ann Arbor, MI

Circuit Court Damper Replacement Project
Results
Mount Clemens, MI 48043

Reported 06/03/2022 12:00 AM
Project Title

Gratiot County Courthouse HVAC Unit 3

Physical Address View project details and contacts
City, State (County) Ithaca, MI 48847   (Gratiot County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Gratiot County Board of Commissioners (the County) invites qualified contractors to submit proposals for the Gratiot County Courthouse HVAC Unit #3 and associated components. 1. Remove / replace the existing Aaon roof top unit, AC-3, with new Aaon variable air volume roof top unit as selected by JOC Sales (model number RN-013-8). Note unit shall be gaselectric true-VAV with stainless steel HX, modulating gas burner, (2) 2-step compressors, 100% full economizer, powered exhaust, and demand control CO2 controller, that shall match the original unit's electrical MOPC. 208/3-phase. 2. A curb adaptor should not be needed for the replacement unit as selected. 3. Contractor shall include gas piping disconnect / reconnection. 4. Contractor shall include electrical power disconnect / reconnection

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents