Similar Projects
Last Updated | 04/11/2023 03:05 PM |
Project Title | Local Road Improvement |
Physical Address | View project details and contacts |
City, State (County) | Turtle Lake, WI 54889 (Barron County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $180,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Town Board of the Town of Beaver is requesting bids for the following Local Road Improvement Program project: This is a LRIP funded project. Project description: prepare & shape road base adding additional gravel as needed; place 2 1/2 of warm mix asphalt 22 wide (11 travel lane) and placement of 2 of town supplied gravel shoulders compacted on the following section of road: 15th Street from 135th Avenue to 150th Avenue/Termini (Approximately 1.5 miles) Contractor to supply all required traffic control measures per Uniform Traffic Control Devices (MUTCD). Proof of liability and workers comp insurance required. Project to be completed by 9/1/2022. The Town reserves the right to reject any and all bids, to waive irregularities in any bid, and to accept any bid, which is most advantageous to the Town of Beaver. Bidders should contact Ethan Yeske, Town Chair with any questions at 715-986-2065. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |