Last Updated 06/09/2021 08:39 AM
Project Title

Pavement Markings

Physical Address View project details and contacts
City, State (County) (Colleton, Dorchester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 25.000 Sy Borrow Excavation 180.000 Cy Maintenance Stone 22.579 Ton Liquid Asphalt Binder Pg76-22 455.935 Ton Full Depth Asph. Pav. Patching 6" Unif. 2,257.891 Sy Milling Existing Asphalt Pavement (Variable) 17,209.400 Sy Milled-In Rumble Strip 6.080 Mi Hot Mix Asphalt Surface Course Type d 820.375 Ton Hot Mix Asphalt Surface Course Type e 6,031.994 Ton Driveway Paving-Surface Type d 193.125 Ton Permanent Construction Signs (Ground Mounted) 1,192.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 5,606.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 32,102.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 424.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 1.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 1.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 1.000 Ea Railroad Crossing Symbols - Perm.Pvmt.Marking 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 2,110.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 40,749.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 11,212.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 64,204.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 848.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 2.000 Ea White Word Message "Only"-Fast Dry Paint 2.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 2.000 Ea Railroad Crossing Symbols - Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 4,220.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 81,498.000 Lf 6"Yel Solid Lines On 6"Conc.Curb(Top&Side)-Fast Dry Pnt 1,970.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 143.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 104.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 859.000 Ea Removal Of Pavement Markings 245.000 Lf Removal Of All Pavement Markings 9.860 Lm Detectable Warning Material 10.000 Sf Pedestrian Ramp Construction 25.000 Sy Root Barrier 614.000 Lf

Details

Division 10 - Specialties, Signage, Traffic Signage.
Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings.
Division 34 - Transportation, Roadway Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents