Similar Projects
CDBG Funded Home Repairs - Interior and Exterior Contractor
Term Contract
Bidding
$50,000 est. value
Herndon, VA

The Rotunda Roof Apron and Gutter Repair Project
Alteration
Bidding
$600,000 est. value
Farmville, VA 23909

Escalator Canopies and Stair Replacement - Phase 4
Post-Bid
Washington, DC

Escalator Canopies and Stair Replacement - Phase 4
Post-Bid
Washington, DC

Repair of Oil Containment Area Walls and Floor
Results
Burkeville, VA

ADA Compliant Vestibule
Renovation - 57 SF
Results
Hampton, VA 23669

Graduate Housing Stairwell Replacement Phase II
Alteration
Post-Bid
$500,000 est. value
Williamsburg, VA 23185

Cubicle Renovations and Installation Services for Board of Pharmacy
Results
Henrico, VA

Set of Structural Stairs
Term Contract
Post-Bid
Portsmouth, VA 23709

Lugo-Mcginness Siding Replacement
Alteration
Results
Charlottesville, VA

844 Pine Street Roof and Gutters Repair
Alteration
Post-Bid
Danville, VA 24541

Maintenance Garage and Equipment Storage Canopy
New Construction, Alteration
Results
Mount Crawford, VA 22841

Downtown Narrows Building Facade Renovations
Alteration
Post-Bid
Narrows, VA

Carlin Springs Road Building De-Coupling Phase
Renovation, Demolition - 64,301 SF
Results
Arlington, VA 22204

Siding and Gutter Repairs Residence Coursey Springs Hatchery
Alteration
Post-Bid
Williamsville, VA 24487

Reported 05/18/2022 12:00 AM
Project Title

Wytheville Regional Animal Health Laboratory Incinerator Canopy

Physical Address View project details and contacts
City, State (County) Wytheville, VA 24382   (Wythe County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of a pre engineered canopy structure over the existing incinerator and receiving dock area. As part of the project, the existing sanitary waste line that is currently located under the incinerator will be relocated and the asphalt paving will be replaced with concrete paving.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents