Similar Projects
Webster School Structure
New Construction
Conception
$9,310,000 est. value
Yankton, SD 57078

John F. Kennedy Elementary School Renovations
Renovation
Design
$5,770,000 est. value
Sioux Falls, SD 57106

Hayward Elementary School Renovations
Renovation
Design
$813,000 est. value
Sioux Falls, SD 57107

Construction Manager at Risk Services - Classroom Additions to Existing School
Addition
Bidding
Lake Andes, SD 57356

Cleveland Elementary School - CIP Addition and Renovation
Renovation, Addition
Post-Bid
Less than $7,500,000 est. value
Sioux Falls, SD 57103

Deubrook Area Schools Facility Improvement
Renovation, Addition
Post-Bid
Toronto, SD 57268

Jane Addams Elementary School
Addition
Results
$2,000,000 est. value
Sioux Falls, SD 57104

Deubrook Area Schools Track and Field
Renovation, Addition
Results
Brookings, SD

Saint Joseph School Classroom
Renovation
Construction
Pierre, SD 57501

Kids R Kids Academy Elementary and Preschool
New Construction - 17,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Sioux Falls, SD 57108

Northwest Elementary School Construction
Renovation
Design
$21,510,000 est. value
Sioux Falls, SD

Lead Deadwood Schools Elementary Phase 3A
Renovation
Post-Bid
$205,000 est. value
Deadwood, SD 57732

Wagner School 2021 Classroom Addition Phase 2
Addition - 23,912 SF
Results
Wagner, SD 57380

Horace Mann Elementary School Renovations
Renovation
Design
$2,464,070 est. value
Sioux Falls, SD 57105

Design-Build Single Toilet and Sink Bathroom
Renovation
Post-Bid
Hill City, SD

Reported 10/28/2021 12:00 AM
Project Title

Construction Manager at Risk - New K-5 Building

Physical Address View project details and contacts
City, State (County) Rosebud, SD   (Todd County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction manager assumes the risk for construction, or repair of a public improvement, and provides construction management services to the public corporation. The Construction Manager at Risk shall directly contract with the subcontractors and suppliers for the project. In the role of Construction Manager at Risk, the successful applicant would fulfill the following requirements, pursuant to SDCL 5-18B-40. (1) Services provided in the planning and design phases of a public improvement project including the following: (a) Consulting with, advising, assisting, and making recommendations to the public corporation and architect or engineer on all aspects of planning for project construction; (b) Reviewing all plans and specifications as they are being developed and making recommendations with respect to construction feasibility, availability of material and labor, time requirements for procurement and construction, and projected costs; (c) Making, reviewing, and refining budget estimates based on the public corporations program and other available information; (d) Making recommendations to the public corporation and the architect or engineer regarding the division of work in the plans and specifications to facilitate bidding and awarding of contracts; (e) Soliciting the interest of capable contractors and assisting the public corporation in taking bids on the project; (f) Analyzing received bids and verifying compliance with all local and state bidding statutes; and (g) Preparing and monitoring a progress schedule during the design phase of the project and preparation of a proposed construction schedule; and (2) Services provided in the construction phase of the public improvement project including the following: (a) Maintaining competent supervisory staff to coordinate and provide general direction of the work and progress of the contractors on the project; (b) Observing the work as it is being performed for general conformance with working drawings and specifications; (c) Establishing procedures for coordinating among the public corporation, architect or engineer, contractors, and construction manager with respect to all aspects of the project and implementing labor policy in conformance with the requirements of the public corporations policy and making recommendations; (d) Reviewing and processing all applications for payment by involved contractors and material suppliers in accordance with the terms of the contract; (e) Making recommendations for and processing requests for changes in the work and maintaining records of change orders; (f) Scheduling and conducting job meetings to ensure orderly progress of the work; (g) Developing and monitoring a project progress schedule, coordinating and expediting the work of all contractors, and providing periodic status reports to the owner and the architect and engineer; and (h) Establishing and maintaining a cost control system and conducting meetings to review costs

Details

Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents