Similar Projects
Chinook Pier Redevelopment
Infrastructure
Bidding
Grand Haven, MI 49417

Construction of an Improved Dock Facility at Rock Harbor, Isle Royale National Park
Post-Bid
$1,000,000 to $5,000,000 est. value
Houghton, MI

Removal Repair or Replacement of Hawk Woods Park Marsh Boardwalk
Infrastructure
Post-Bid
Auburn Hills, MI 48326

Foundation Stabilization Repair for Piers 2, 4, 6, 8 and 10 on Grosse Ile Parkway Bridge
Results
MI

Municipal Marina C Dock Replacement
Results
Ludington, MI

AAM - Three Rivers Dock Expansions
Renovation, Addition
Construction
Three Rivers, MI 49093

Sault Sainte Marie Carbide Dock Port
Renovation
Pending Verification
Sault Sainte Marie, MI 49783

Riverside Seawall Repair at DFD Fireboat Station
Infrastructure
Post-Bid
Detroit, MI 48216

Construction of Waterfront Improvements
Results
East Jordan, MI 49727

Hopkins Lake Dock
Infrastructure
Post-Bid
Owosso, MI

Black River Small Watercraft Dock Enhancement
Results
South Haven, MI

DNR Waterways - Water Mobility Construction
Alteration
Post-Bid
Saint Joseph, MI

Marina Fuel System And Service Dock Replacement
Results
Cheboygan, MI

Lake Antoine Park Boat Launch Renovation Project
Results
Iron Mountain, MI

Sturgeon Lake Boat Launch Improvement Project
Results
MI

Last Updated 10/12/2021 11:56 AM
Project Title

Marina Dock Repairs Phase 2

Physical Address View project details and contacts
City, State (County) Manistee, MI   (Manistee County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following: Dock Replacement Replacement of (5) docks within the City of Manistee Marina and ensure that all docks are adjustable. Remove 270 lft of existing timber docks, support piles, and mooring piles. Install 40 new steel pilings as shown on plans, and 280 lft of new galvanized steel adjustable docks including support system and deck materials (5 docks total). New docks shall be built and installed to match the (12) docks installed as Phase I, constructed in 2019.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents