Similar Projects
Storm Water Master Plan - Dixon Creek West Branch - Ponderosa To Glenridge - City Of Corvallis
Infrastructure
Conception
$465,000 CJ est. value
Corvallis, OR 97330

Wastewater Pipe Replacement - Witham Hill Drive - City of Corvallis
Infrastructure
Conception
$880,000 CJ est. value
Corvallis, OR 97330

South Baker Intermediate School: Bus Loop
Infrastructure
Design
$140,000 CJ est. value
Baker City, OR 97814

South Baker Intermediate School: Bus Loop
Infrastructure
Design
$140,000 CJ est. value
Baker City, OR 97814

Cougar Spillway Gate 2 Rehabilitation
Infrastructure
Bidding
$10,000,000 CJ est. value
McKenzie Bridge, OR 97413

RFP Engineering - Morrison Bridge Strengthening
Infrastructure
Bidding
$1,400,000 CJ est. value
Portland, OR 97204

Lagoon Site Fencing Project For South Suburban Sanitary District
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Klamath Falls, OR 97603

Statewide ADA Crosswalk Closures (Region 1 and Region 2) Package 1A
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Portland, OR 97204

Ecola Ridge Young Stand Thinning
Alteration
Post-Bid
Cannon Beach, OR 97110

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

Home2 Suites By Hilton / Medford
New Construction, Infrastructure - 72,820 SF
Pending Verification
$22,000,000 CJ est. value
Medford, OR 97504

Pressure Zone Consolidation - Zones 560C and D - 22CIP-04 - City of Tigard
Infrastructure
Conception
$335,000 CJ est. value
Tigard, OR 97223

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
Less than $8,700,000 est. value
Medford, OR 97501

Last Updated 08/12/2022 11:09 AM
Project Title

Mosier EV Charging Station Project

Physical Address View project details and contacts
City, State (County) Mosier, OR 97040   (Wasco County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $172,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 12th, 2022, project has not been awarded yet. No timeline of award was established. Bids received after the time and date specified will not be considered. All bids received prior to the due date and time and in proper form will be publicly opened and read at Mosier City Hall, 208 Washington Street. Bidders must submit a first-tier subcontractors disclosure list within two hours of the date and time for receipt of bids. Failure to submit the required first-tier subcontractors list within the required two hours of the date and time for the receipt of bids will disqualify the bidder from further consideration. No bidder may withdraw its bid after the time announced for the opening, or before the award and execution of the Contract, unless the City elects to delay the award for a period exceeding 60 days. The Project has an expected duration of 60 calendar days. The Notice to Proceed may be delayed if necessary due to supply chain issues. Work to be performed includes: construction necessary for the installation of two Chargepoint CPE250 Level 3 DC fast chargers, or approved equal; installation of an E-bike charging station; and installation of a table with integrated solar powered awning (Lumos Solarzone, or approved equal). The work is located at the currently vacant City-owned parking lot on the north side of US Highway 30 near the intersection of Highway 30 and Idaho St. The work includes all electrical work necessary for the improvements, minor grading, asphalt paving, construction of concrete pads, lighting, and signage and parking lot striping. The contractor shall procure the EV chargers and coordinate with the manufacturer or the manufacturer's representative to commission and validate the installation for warranty purposes. The project is subject to prevailing wage rates under ORS 279C.800 to 279C.870. Each bid must include a signed statement as to whether the contractor is a resident bidder as provided in ORS 279A.120. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The City of Mosier reserves the right to reject any or all bids and to waive irregularities in the request for bids. John Grim P.E. - City Engineer, of John Grim & Associates is the City's representative for this procurement and may be contacted regarding this project at: John Grim P.E., PO Box 955, Lyle, WA 98635, (509) 365-5421, jgrim@johngrimassoci ates.com. Technical questions about the design drawings and specifications shall be referred to the Project Manager, Jonathan Nelson, Conifer Energy Partners LLC, Phone: 303.709.9600, jonathan@coniferenergypartners.com.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Site Remediation, Facility Remediation.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Site Clearing, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation, Operation and Maintenance of Roadways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents