Similar Projects
Philmnt/Tomlinson/Pine Rd Int
Infrastructure
Conception
$24,196,000 CJ est. value
Lower Moreland Township, PA 19006

District Wide Bridge Rehab Group P
Infrastructure, Renovation
Conception
$8,358,000 CJ est. value
Schwenksville, PA 19473

AutoZone #5334 / Norristown
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
East Norriton, PA 19401

N Narberth Avenue O/AMTRAK
Demolition, New Construction, Infrastructure
Design
$10,747,000 CJ est. value
Narberth, PA 19072

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

High School Sanitary Sewer Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Pottstown, PA 19464

2021 PFAS Water Service Connections Contract 21-6
Infrastructure
Results
$420,000 to $520,000 est. value
Horsham, PA

Otts Road Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$1,198,213 CJ est. value
Marlborough Township, PA 18073

300 Penn Street Redevelopment
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Pennsburg, PA 18073

Janssen Biotech
Demolition, New Construction, Infrastructure - 35,848 SF
Construction
$12,000,000 CJ est. value
Horsham, PA 19044

Main Street/SR 29 Ped Improvements
Infrastructure
Conception
$682,000 CJ est. value
Collegeville, PA 19426

23: Moore to Geerdes
Infrastructure
Design
$23,610,000 CJ est. value
King of Prussia, PA 19406

Main Street Streetscape Phase IV
Infrastructure
Bidding
$896,908 CJ est. value
Norristown, PA 19401

Valley Green Wastewater Treatment Plant Improvements Project - General and Electrical Construction
New Construction - 392 SF
Results
$125,000 to $350,000 est. value
Worcester, PA

New Keith Valley Middle School
New Construction, Infrastructure
Construction
$112,492,000 CJ est. value
Horsham, PA 19044

Last Updated 03/07/2023 08:02 AM
Project Title

Evergreen Avenue Bioswale and Infiltration Basin - Cheltenham Township

Physical Address View project details and contacts
City, State (County) Harleysville, PA 19438   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $270,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is in included in the Cheltenham Township FY 2023-2027 Capital Improvement Plan (CIP). As of March 06, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents