Similar Projects
Kwik Trip / Reedsburg
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Reedsburg, WI 53959

Hillsboro - Reedsburg Const / Mill and Overlay
Infrastructure
Conception
$5,000,000 CJ est. value
Reedsburg, WI 53959

Waldo Street Condominiums
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Baraboo, WI 53913

J's Pub and Grill - Outside Addition
Addition, Renovation, Infrastructure
Design
$100,000 CJ est. value
Reedsburg, WI 53959

Deppe Wagon Pavilion Mold Remediation and Improvements
Renovation - 28,337 SF
Bidding
$1,604,000 CJ est. value
Baraboo, WI 53913

Village Forest Park Phase 3
Infrastructure
Bidding
$500,000 CJ est. value
Baraboo, WI 53913

Lake Redstone Swallow Bay Spillway Restoration
Infrastructure
Post-Bid
La Valle, WI

Well Drilling Services
Infrastructure
Post-Bid
WI

Building Demolition and Site Grading
Demolition, Infrastructure
Results
North Freedom, WI

Highway Department Headquarters Facility and Satellite Facility
New Construction, Renovation - 209,605 SF
Results
Baraboo, Reedsburg, WI 53959

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pelton Apartments
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Reedsburg, WI 53959

Ironton - Woodland (CTH G) Constr OPS / Pavement Replacement
Infrastructure
Design
$3,000,000 CJ est. value
Ironton, WI 53941

Village Forest Park Project - Playground Development
Infrastructure - 2,500 SF
Post-Bid
$540,000 CJ est. value
Baraboo, WI 53913

Baraboo and Reedsburg Facilities
New Construction, Infrastructure - 164,640 SF
Results
$10,000,000 CJ est. value
Baraboo, Reedsburg, WI 53913

Last Updated 11/21/2022 12:09 PM
Project Title

Reedsburg Fieldhouse

Physical Address View project details and contacts
City, State (County) Reedsburg, WI 53959   (Sauk County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of 11/09/2022 Project is over budget. Will be making decisions in the next couple of weeks. All scope related questions are to be submitted in writing to the attention of Bart Lechner at blechner@holtzbuilders.com, no later than October 1, 2022 by 1:00PM. All questions will be answered via a bid clarification or an addendum. The building is a combined 53,578 SF to include a 7,540 SF pre-engineered metal building and 46,038 SF air supported structure. All bids must include the required documentation per the bidding instructions. Please be advised the client is tax exempt. No bidder may withdraw their bid within 45 days after the actual date of the opening thereof. Owner reserves the right to reject any or all bids, waive or not waive any informalities in the bids received, and to accept any proposal which they deem most favorable to the interests of the Owner.

Details

,, 53,578 SF - 46,038 SF. 7,540 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents